CITY COUNCIL DRAINAGE REPORT <br />July9, 2012 <br />Contract Design and Construction <br />th <br />South 16Street.Design complete, pending agency approval. <br />F101 Channel Improvements by HCFCD. Hydro excavation complete. Land <br />Dev Engineering preparing Preliminary Engineering Reportto be finalized by <br />January 2013. <br /> <br />Third Street Drainage Improvements.Received contract from Texas General <br />Land Office, procurement of engineering service to follow. <br />F216 Regional Detention Phase II.Survey complete, Hydrologic and Hydraulic <br />study underway.Preliminary findings are expected by mid July. <br /> <br />In-House Design and Construction of City-Initiated Projects <br />Battleview Area.Survey and design complete. Plans submitted for pipeline <br />review and approval. <br />East Main.Construction is substantially complete. <br /> <br />Sunrise and Broadway.Installation of additional culverts by Public Works at <br />South Shady Lane and Baywood along Broadway in progress. <br />Battleground Estates and Shady River.Submitted request to HC for <br />improvements of P Street and F101 and contracting with consultant to prepare an <br />impact analysis for McCabe Road and A104. <br />In-House Drainage Maintenance Activities <br />North Shady Lane.Survey is complete and design underway for drainage <br />improvements along North Shady Lane. <br />In-Fill DrainageMaintenance.Public Works working oncompleting drainage <br />th <br />maintenance at 15and C Streetand East Main Street. <br />Arizona Ditch from C Street to D Street.Public works to begin construction of an <br />overflow swale and upsize the storm sewer system for additional capacityby the <br />week of June 28th. <br /> <br />