My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-12 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2012
>
07-09-12 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2012 9:28:42 AM
Creation date
7/25/2025 3:12:05 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/9/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY COUNCIL DRAINAGE REPORT <br />July9, 2012 <br />Contract Design and Construction <br />th <br />South 16Street.Design complete, pending agency approval. <br />F101 Channel Improvements by HCFCD. Hydro excavation complete. Land <br />Dev Engineering preparing Preliminary Engineering Reportto be finalized by <br />January 2013. <br /> <br />Third Street Drainage Improvements.Received contract from Texas General <br />Land Office, procurement of engineering service to follow. <br />F216 Regional Detention Phase II.Survey complete, Hydrologic and Hydraulic <br />study underway.Preliminary findings are expected by mid July. <br /> <br />In-House Design and Construction of City-Initiated Projects <br />Battleview Area.Survey and design complete. Plans submitted for pipeline <br />review and approval. <br />East Main.Construction is substantially complete. <br /> <br />Sunrise and Broadway.Installation of additional culverts by Public Works at <br />South Shady Lane and Baywood along Broadway in progress. <br />Battleground Estates and Shady River.Submitted request to HC for <br />improvements of P Street and F101 and contracting with consultant to prepare an <br />impact analysis for McCabe Road and A104. <br />In-House Drainage Maintenance Activities <br />North Shady Lane.Survey is complete and design underway for drainage <br />improvements along North Shady Lane. <br />In-Fill DrainageMaintenance.Public Works working oncompleting drainage <br />th <br />maintenance at 15and C Streetand East Main Street. <br />Arizona Ditch from C Street to D Street.Public works to begin construction of an <br />overflow swale and upsize the storm sewer system for additional capacityby the <br />week of June 28th. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.