Laserfiche WebLink
Mick, David <br />From: Garza, Julian <br />Sent., Wednesday, March 20, 2013 9:08 AM <br />To: Mick, David <br />Cc: Pennell, Don; Slaton, Rodney; Tietjens, Tim <br />Subject: FW: Final Notification for Farrington Road Reconstruction and Drainage Improvements, <br />From Fairmont Pkwy to Spencer Hwy, Precinct 2, UPIN 1102M23KN01 <br />Attachments: Farrington100%UtilityTable.pdf <br />FYI <br />Julian Garza Jr., P.E. <br />City Engineer <br />City of La Porte <br />281-470-5063 <br />From: Jones, Diane (Engineering) [aiailto:Diane.Jones @l)cpid.or ] <br />Sent: Wednesday, March 20, 2013 8:20 AM <br />To: 'MADRIGAL, JOSE U m28802at_t.corn); 'Margaret_blackwell@cable.comcast.com', <br />'william_leopard@cable.comcast.com'; Cynthia Martinez (!ink._Mart nnez@center Qintenergry.cQ ); 'L.engyel, John <br />William' ohn.leng el r@centeroointenergy.corn); Louis G. Cardenas Jr. (Io is.cardenas cer�te�0t�ner€Jy.cor ); <br />'Simmons, Lory A.' (Ioly s€,r mons c nterpo te�eroy,cc� ); i�Vau. ice terpdnt neW corq; Garza, Julian; <br />bill.scgq, a cer�teruointen rgy cc r ; ail. allarado , att.ijom <br />Cc: Vu, Tom (Engineering); Briggs, Paul (Engineering); Smith, Loyd (Engineering); Jones, Terry (Engineering); Veda <br />Graves; centralfile <br />Subject: Final Notification for Farrington Road Reconstruction and Drainage Improvements, From Fairmont Pkwy to <br />Spencer Hwy, Precinct 2, UPIN 1102M23KN01 <br />Final Notification to Utility Companies <br />All, <br />This email serves as formal notification to all Utility Companies with facilities located within public <br />right-of-way pursuant to the Utilities Code/Title 41Subtitle Bi Chapter 181. <br />Harris County expects to receive bids for construction of the subject project in March 2013 with construction to <br />follow in approximately 90 days. The final construction drawings are available for download at <br />vvv.dvcast sa.com as outlined in the letter previously transmitted to your company. <br />It is necessary, at this time, to begin the immediate relocation of any and all facilities which you operate that <br />are in conflict with the proposed construction. While every effort has been made to represent your facilities <br />accurately on the drawings, this notice is intended to include all conflicting facilities whether indicated on the <br />construction drawings or not. Please advise me at such time as the extent of your relocation work has been <br />determined, and a schedule for such work has been prepared. <br />Project ID: 630--APIN 1 ` 0 M23KNO <br />Password: UCKN01 <br />Your usual cooperation and immediate attention to this matter will be appreciated. If you have any questions <br />feel free to contact myself at the number below or Paul Briggs at (713)755-7003. <br />Sincerely, <br />Diane Jones <br />Utility Coordinator <br />Harris County Public Infrastructure Dept. <br />