My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-11-13 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2013
>
11-11-13 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 10:44:52 AM
Creation date
7/25/2025 3:15:39 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
11/11/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: November 11, 2013 <br />Requested By: David Mick <br />Department: Public Works <br />Report: Resolution: Ordinance: <br />Exhibit: Cobb Fendlev Professional Services Proposal <br />Budget <br />019 (Drainage Fee) <br />Source of Funds: 033 (Street Tax) <br />Account Number: <br />019 ($ 60,000) <br />Amount Budgeted: 033 (%150,000) <br />019 ($ 18,000) <br />Amount Requested: 033 ($109,950) <br />Budgeted Item: YES NO <br />SUMMARY & RECOMMENDATION <br />The FY 14 budget includes an allocation for the design of Catlett (Valleybrook to Farrington), <br />Belfast (Valleybrook to Farrington), and Pineybrook (Antrim to Carlow). The City of La Porte <br />staff has reviewed the enclosed professional services proposal from Cobb, Fendley & Associates, <br />Inc. to provide professional engineering services for the design, bidding, and construction phase <br />services for this project. The price proposal submitted by Cobb Fendley (attached) totaled <br />$117,950.00. The total request is $127,950.00 including a $10,000 contingency and is within <br />budget. <br />Budgeted Design Cost: $230,000 (FY 13_14) <br />Requested Design Allocation: $127,950 (FY 13 14)** <br />Preliminary Construction Budget Estimate: $2,300,000 (FY 14_15) <br />Updated Construction Budget Estimate: $1,700,000 (FY 14 15)** <br />** Work required on the existing storm, water/sewer facilities will not be as extensive as was <br />contemplated with the preliminary budget estimate. The design fee and construction budget <br />estimates are reduced accordingly. <br />The price proposal references Phase 1 and Phase 2 areas. Staff directed Cobb Fendley to <br />consider the potential for a phased project with the proposal in the event that budget dictated a <br />need to reduce the project scale. Phase 1 includes Pineybrook and the segments of Catlett and <br />Belfast between Valleybrook and Pineybrook. Phase 2 includes the segments of Catlett and <br />Belfast from Pineybrook to Farrington. The HDR street inspection rating was 2 of 9 (9 being the <br />best) for the Phase 1 area; 3 of 9 for the Phase 2 area. Staff recommends constructing both <br />phases simultaneously to complete the improvements from Valleybrook (reconstructed in 2008) <br />to Farrington (currently under construction). <br />Anticipated completion of the design is March, 2014. <br />At least one public meeting with the residents is anticipated during the design process along with <br />other resident contacts to identify any access or other considerations of the residents. <br />
The URL can be used to link to this page
Your browser does not support the video tag.