My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-24-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
02-24-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 3:00:21 PM
Creation date
7/25/2025 3:16:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID SPECIFICATION <br />PART 1: GENERAL <br />1.1DESCRIPTION <br />Project Name:Fairmont Park Pool Building <br />Location:La Porte, Texas <br />Specification Date:2/17/2014 <br />The work shall include furnishing the sealed architectural, mechanical, electrical and structural <br />plan sets as well as the structuraland mechanicalbuilding components as a complete, pre- <br />designed, packaged, and constructed restroom building as shown on drawings and as specified <br />herein. <br />1.2SCOPE <br />A.Packaged restroom building and all associated design and engineering, with all listed <br />components supplied and constructed by Romtec, Inc. <br />B.Romtecis also responsible for building installation. Installation work will generally <br />include excavating and pouring the footing, foundation, and slab, connection to <br />utilities, plumbing and electrical rough in, and trim out of the complete building with <br />all fixtures and features. <br />C.Romtec packaged restroom buildings are the latest standard product of a building <br />supplier regularly engaged and having at least twenty (20) years of experience in <br />packaged restroom building engineering, design, supply, and construction. <br />D.The buildingand its concrete footings, foundation, and slab areto be engineeredby <br />Romtecto meet site specificconditions including wind and snow loading, local frost <br />depth, andground conditions. <br />E.Footings are dugby Romtecand poured on site to meet local code for permanent <br />structures. Aprefabricated, modular mat placed on compacted base is not an <br />accepted equal to a site specific, site poured,engineered foundation. <br />F.Building is to be designed and constructed on siteto meet local codes and approvals <br />for permanent structures.Any building that is temporary, permanently relocatable, <br />prefabricated modular, an offsite constructed product, or pre-cast isnot an accepted <br />equal to permanent, on site, conventional construction. <br />Romtec Inc. <br />Page 1of 8 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.