Laserfiche WebLink
BID SPECIFICATION <br />C.Floor drain(s)shall be supplied by Romtec. <br />D.Water line drain valve shall be supplied by Romtec. <br />owner supplied <br />E.Sewer line backflow check valve shallbe . <br />2.7ELECTRICAL <br />A.Electrical rough-inshall be supplied by Romtec. <br />1.All underground and/or overhead service to building shall be as specified in the <br />final site plan. <br />2.Electric meter base and all rough wiring, switches, plugs and circuit breakers <br />shall be as shown on final plans. <br />Note:Romtecdoes not supply the meter baseand meter. <br />B.Electrical installation and trimshall be supplied by Romtec. <br />1.Romtecis responsible for all necessary wire, connectors, grounding, conduit etc. <br />to install the components. <br />2.The installation of these components shallcomply with all state and/or local <br />codes. <br />3.Romtecshall provide #4 bare copper ground wire per NEC 250 and approved <br />connectors per plans. <br />C.Interior and exterior restroom light fixtures shall be supplied by Romtec. <br />D.Main breaker panelshall be supplied by Romtec. <br />2.8OTHERMATERIALS & EQUIPMENT SUPPLIED BY ROMTEC <br />A.All equipment, labor and trades to unload the building, excavate the site, build <br />concrete forms, supply and install the reinforced concrete footings and slab, and <br />install the building and fixtures is supplied by Romtec. <br />2.9OTHER MATERIALS & EQUIPMENT SUPPLIED BY OWNER(if applicable) <br />A.Relocation or installation of existing utilities. <br />B.Landscaping. <br />C.Irrigation equipment. <br />Romtec Inc. <br />Page 7of 8 <br /> <br />