My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
02-24-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
02-24-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2014 3:00:21 PM
Creation date
7/25/2025 3:16:12 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
2/24/2014
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Extended <br />Model #DescriptionUnit Price <br />Price <br />SUBTOTAL$33,169.00 <br />-$2,757.12 <br />TXMAS DISCOUNT: Available onlyto qualified Texas State & Local Entities. <br />Design Services SIN# 361-30 - Includes up to two unsealed revisions in response to comments. Should additional <br />$2,632.00 <br />revisions need to be made, an additional quantityof Design Services will be charged at the same rate. <br />La Porte TX <br />Shipping and handling from Roseburg, OR to:$6,861.25 <br />TXMAS Installation Contract SIN# 361-32 <br />TXMAS BUILDING TURNKEY INSTALLATION QUOTE: Sierra Concrete Turnkey Installation assumes a prevailing wage job, which is <br />semi-truck accessible, with utilities within 10 feet of foundation. Includes connection to utilities and plumbing and electrical rough in. <br />Turnkey Installation also include excavation and pouring the footing,foundation and slab. Plus, the construction and trim out of the <br />$84,375.00 <br />complete building with all fixtures and features. The TXMAS contract does not require bonding, therefore none has been quoted and bonding <br />will not be provided. Removal ofexcavated materials,permits, rock excavation, demolition, sidewalks and other site construction are not <br />included. This quote is per the forthcoming Scope of Supply Design Submittal. SIN# 361-32 <br />TXSmartBuy Administrative Fee <br />$607.68 <br />TOTAL$124,887.80 <br />ONE COMPLETE SET OF SEALED CONSTRUCTION DRAWINGS ON 11"X17" FORMAT, INCLUDING FOOTING & FOUNDATION <br />DETAILS, ISINCLUDED WITH BUILDING PURCHASE.Any additional sealing or change in plan set size will result in an additional <br />charge and is not included in the building price. Romtec's design services quoted herein are conditioned upon, and cannot be <br />purchased separate from, the purchase of the applicable Romtec building model. <br />* This quote includes the design &engineering by Romtec to produce a complete plan set that will meet the architectural and engineering code required in <br />your state. In some cases local code may vary fromtypical state requirements and may result in a change in price that could nothave been anticipated at <br />time of quote. <br />* All prices listed above are F.O.B. Roseburg, OR, freight prepaid and added. Delivery will be in accordance with a mutually agreed upon timeline as stated in <br />the Romtec notice to proceed document <br />* Unless otherwise agreed to, the owner of the project is expected to provide "builder's risk" Insurance coverage on this project. Romtec makes no provision <br />for such costs in this quote. <br />* This quote is effective for 90 days fromabove date; thereafter all prices are subject to change withoutnotice. <br />* Delivery will be in accordance with a mutually agreed upon timeline as stated in the Romtec notice to proceed document. <br />PAGE 2OF 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.