My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-10-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
03-10-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2014 12:46:07 PM
Creation date
7/25/2025 3:16:15 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/10/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
315
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The project will address one the lower rated concrete street segments identified in the 2013 comprehensive street The project will address one the lower rated concrete street segments <br />identified in the 2013 comprehensive street <br />inspection report. The project also includes removal and replacement of the nearly 50inspection report. The project also includes removal and replacement of the nearly 50--year old <br />asbestos concrete year old asbestos concrete <br />water main. <br /> <br /> <br /> <br />Liabilities: <br /> <br />Deferring the project construction would add to future year maintenance responsibilities unless substituted with a Deferring the project construction would add to future year maintenance <br />responsibilities unless substituted with a <br />like project. <br /> <br />Operating Costs: Operating Costs: <br /> <br />Slight decrease in operating costs. Slight decrease in operating costs. <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action to grant the City Manager authority to enter into a professional services contract Consider approval or other action to grant the City Manager authority <br />to enter into a professional services contract <br />with LJA Engineering, Inc. for the design, bidding and construction phase services for the Scotchmoss Lane with LJA Engineering, Inc. for the design, bidding and construction phase services <br />for the Scotchmoss Lane <br />improvements with a total authorization equal to $79,500.00. D. Mickimprovements with a total authorization equal to $79,500.00. D. Mick <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.