My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-27-14 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2014
>
10-27-14 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2014 4:58:33 PM
Creation date
7/25/2025 3:17:28 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
10/27/2014
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Other Considerations: Other Considerations: <br /> <br /> <br /> <br />thth <br />Public Works plans to utilize a Streets Division crew to remove silt from the 8Public Works plans to utilize a Streets Division crew to remove silt from the 8 Street storm sewer outlets <br /> Street storm sewer outlets <br />and from the 6and from the 6’’x6x6’’box. box. <br /> <br />Additional costs associated with this project include $3,000 for materials testing and up to $4,000 for an Additional costs associated with this project include $3,000 for materials <br />testing and up to $4,000 for an <br />attachment for existing city equipment or equipment rental to aid city crew efforts to remove the silt from attachment for existing city equipment or equipment rental to aid city crew <br />efforts to remove the silt from <br />the 6’x 6x 6’’box. box. <br /> <br />Action Required of Council:Action Required of Council: <br />Consider approval or other action for the award of Bid No. 14033 to Brooks Construction Consider approval or other action for the award of Bid No. 14033 to Brooks Construction <br />Inc. for the West D Street Drainage Improvements in the amount of $88,305.50 plus a 12% Inc. for the West D Street Drainage Improvements in the amount of $88,305.50 plus a 12% <br />contingency with a total allocation for the construction contract equal to $98,900.00.contingency with a total allocation for the construction contract equal to $98,900.00. <br />Approved for City Council AgendaApproved for City Council Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.