My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-12-15 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2015
>
01-12-15 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 11:18:33 AM
Creation date
7/25/2025 3:18:09 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/12/2015
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of La Porte Planning and Development Department <br />M E:•tabllii:;llred 11892 T'iiorn "lf'iieticir)s, Diiirea::::crir <br />Tax*$ <br />January 12, 2015 <br />Dow Hydrocarbons and Resources, LLC <br />1254 Enclave Pkwy. <br />Houston, TX 77077 <br />Attn: Mr. Chico Negual/Wood Group Mustang <br />RE: Pipeline Transportation Permit (PT-14-37000003) <br />Dear Mr. Negual: <br />Your application for a permit to construct a 12" Ethane Y-Grade <br />has been approved by La Porte City Council. You are hereby <br />regulations set forth in City of La Porte Ordinance 2004-2755 and <br />1. Notify City Staff no less than 48 hours prior <br />2. Post copies of this Permit at all public right-of-way crossings <br />3. Per Sec. 102-235, Item (k) of La Porte's Code of Ordiranc <br />any time in the future, where such pipeline or portion thereo <br />street, road or utility right-of-way, drainage way or public W <br />is issued, reposition such pipeline (which, shall include lower <br />if required) at the Permittee's sole expense, when the City <br />public construction or public improvement: construction, in <br />lines, sanitary sewer lines, storm sewers, ditches and public tl <br />written notice of the need for repositioning location, and sui <br />receipt requested, to the Permittee as designated in the applic <br />to complete such repositioning. <br />4. Any and all construction materials utilized 1 <br />ditches, drainage paths and/or drainagee <br />completion of construction at each crossing. <br />5. Any fill material resulting from constructior <br />6. Prior to° <br />fill from <br />Sincerely, <br />Tim Tietjens <br />Planning Director <br />of <br />ie within the city limits of La Porte <br />begin your project as governed by <br />stinulated below: <br />rd. 2004-2755): `the Permittee shall, at <br />ses or is laid within, under or across any <br />isting or projected at the time the permit <br />raising the pipeline, as well as casing it, <br />nably requires such action incidental to <br />ance and improvement of streets, water <br />The City shall give the Permittee prior <br />ice shall be mailed certified mail, return <br />The Permittee shall have six (6) months <br />the pipeline contractor for access across any and all drainage <br />nnels shall be promptly removed by the contractor upon <br />shall be removed or be subject to a Fill Permit from the City. <br />t major rain event, contractor shall remove all construction -related materials and/or <br />way or roadside ditch as to not impede storm water runoff. <br />CC: Finance Department; PT-12-37000001 File <br />City of La Porte 604 W. Fairmont Parkway Phone: (281) 471-5020 <br />Planning and Development LaPorte, TX 77571-6215 Fax: (281) 470-5005 <br />www.laportetx.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.