Laserfiche WebLink
$74,750.00$54,000.00$87,500.00$1,500.00$1,150.00$11,100.00$165,000.00 both project and otherwise; <br />$230,000.00 <br />Horseshoe Construction <br />Extended <br />equipment list included <br />references provided <br />30 <br />650272525011850 <br />Unit Price <br />$495,000.00 <br />$103,500.00$120,000.00$245,000.00$5,700.00$1,150.00$6,900.00$482,250.00 <br />no references <br />Reliance Construction <br />Extended <br />Services, Inc. <br />Sealed Bid #13031 - Rehabilitation of Sanitary Sewer Using Sliplining, Pipe Bursting <br />90060709501115090 <br />Unit Price <br />Information reflects pricing only and other factors may be including during the evaluation process <br />$63,250.00$52,000.00$94,500.00$7,200.00$2,300.00$2,400.00$221,650.00$220,000.00 <br />no references <br />Extended <br />RL Utilities, Inc. <br />40 <br />550262712002400 <br />Unit Price <br />both project and otherwise; <br />$80,500.00$76,000.00$133,000.00$3,300.00$1,150.00$9,000.00$302,950.00$231,000.00 <br />PM Construction & Rehab <br />financial and qualification <br />Extended <br />equipment list included <br />references provided <br />statement included <br />70038385501150042 <br />Unit Price <br />bonding not sealed <br />$43,125.00$40,000.00$77,000.00$2,250.00$1,725.00$2,250.00$166,350.00$159,500.00 <br />no references <br />North Houston Pole Line <br />Extended <br />37520223751.537529 <br />Unit Price <br />Measure <br />Unit of <br />EaEaEa <br />LFLF <br />115200035006115065500 <br />Quantity <br />Estimated <br />with plug and cleanout shoe <br />diameter to 8" diameter 0- <br />1. Reconnection of service 2. Sliplining 6" diameter, 0-3. Sliplining 8" diameter, 0-5. Trench safety system 5'-6. Install end of line cleanout <br />4. Obstruction removal, 0- <br />Alternate Bid for Item #2 <br />7. Pipe burst 6" and 8" <br />NOTES: <br />Base Bid Items <br />line 0-10' deep <br />10 feet deep <br />10' deep10' deep10' deep10' deep <br />and #3 <br /> <br />