Laserfiche WebLink
$25.00$25.00$30.00$50.00$5.00$10.00$110.00$120.00$30.00$80.00 <br />$5.00$10.00$30.00$500.00$300.00$400.00$500.00$650.00$1,000.00 <br />Horseshoe <br />Construction <br />$175.00$200.00$300.00$90.00$6.00$9.00$95.00$120.00$30.00$150.00$30.00$50.00$60.00$300.00$40.00$60.00$80.00$100.00$3,500.00 <br />Construction <br />Services, Inc. <br />Reliance <br />$5,000.00$10,000.00$20,000.00$300.00$15.00$25.00$50.00$300.00$50.00$300.00$50.00$100.00$100.00$400.00$300.00$500.00$800.00$1,000.00$1,000.00 <br />RL Utilities, Inc. <br />PM Construction <br />$532.00$665.00$798.00$19.00$13.00$10.00$86.00$99.00$46.00$79.00$19.00$39.00$29.00$598.00$266.00$532.00$1,064.00$1,596.00$3,325.00 <br />& Rehab <br />North Houston $50.00$75.00$100.00$65.00$8.00$18.00$47.00$122.00$23.00$52.00$5.00$5.00$33.00$375.00$20.00$35.00$45.00$65.00$300.00 <br />Pole Line <br />VFHRHRHR <br />CY <br />LFLFLFLFSFLFLFLF <br />SYSYSYSY <br />EAEA <br />72. Replacement of Base Material and 1 <br />and Base COURSES, VARYING THICKNESS <br />1/2" HMAC (Type D), including tack coat <br />74. Trench Safety System Over 15’ Deep <br />63. Well Pointing for Rehabilitation, Up 64. Well Pointing for Rehabilitation, 10' - 65. Well Pointing for Rehabilitation Over 66. Remove all Types of Street Pavement <br />73. Trench Safety System 10' - 15' Deep <br />68. Removal & Replacement of 4 1/2" 69. Removal & Replacement of 4 1/2" <br />67. Sawed Joint, Concrete/Asphalt <br />70. Removal & Replacement of 6" <br />71. Removal and Replacement of <br />76. Extra Depth for New Manhole <br />75. Extra Cement Stabilized Sand <br />81. Setup for a 3” Bypass Pump <br />Concrete Pavement, including <br />Concrete driveway, including <br />Concrete sidewalk, including <br />77. Bypass for each 3” Pump78. Bypass for each 4” Pump79. Bypass for each 6” Pump80. Bypass for each 8” Pump <br />Concrete Curb <br />reinforcementreinforcementreinforcement <br />to 10' Deep <br />Pavements <br />15’ Deep <br />15' Deep <br /> <br />