My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
03-09-15 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2015
>
03-09-15 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2025 11:26:34 AM
Creation date
7/25/2025 3:18:46 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
3/9/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised 2014 <br />E. TRIGGER CONDITIONS <br />The Public Works Director or his/her designee shall monitor water supply and demand <br />conditions on a weekly basis and shall determine when conditions warrant initiation or <br />termination of each stage of the Plan. The trigger conditions described below reflect system <br />capacity limits and are based on a seven (7) day average daily demand, and include the <br />permitted withdrawal of groundwater. <br />1. Mild Conditions (Stage 1) <br />a. Water demand approaching 6,665,000 gallons/day (70% of the pumping <br />capacity owned by the Authority at the Southeast Water Purification Plant plus <br />allowed groundwater withdrawal). <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point such that <br />the aggregate surface water demand of the Authority is 70% of the reduced <br />pumping capacity. <br />c. Stage 1 may be rescinded when the trigger conditions have ceased to exist. <br />Rescinding any level of the Plan is at the discretion of the Public Works Director. <br />2. Moderate Conditions (Stage 2) <br />a. Water demand approaching 7,618,000 gallons/day (80% of the pumping <br />capacity owned by the Authority at the Southeast Water Purification Plant plus <br />allowed groundwater withdrawal). <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point that the <br />aggregate demand of the Authority is 80% of the reduced pumping capacity. <br />c. Stage 2 may be rescinded when the trigger conditions have ceased to exist. <br />Upon termination of Stage 2, Stage 1 becomes operative. Rescinding any level <br />of the Plan is at the discretion of the Public Works Director. <br />3. Severe Conditions (Stage 3) <br />a. Water demand approaching 8,570,000 gallons/day (90% of the pumping <br />capacity owned by the Authority at the Southeast Water Purification Plant plus <br />allowed groundwater withdrawal). <br />Or, <br />b. Production at the Southeast Water Purification Plant reduced to a point such that <br />the aggregate surface water demand of the Authority is 90% of the reduced <br />pumping capacity. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.