Laserfiche WebLink
Revised 2014 <br />d. Update drought plan status with Texas Commission on Environmental Quality. <br />Utilize current electronic reporting method or other methods as directed by <br />TCEQ. <br />4. Critical Conditions (Stage 4) <br />a. Continue implementation of all relevant actions in preceding phase. <br />b. Petition the Harris -Galveston Coastal Subsidence District for appropriate <br />increase in allowable groundwater withdrawal. <br />c. Ration or terminate water service to selected portions of the system according to <br />the following order: <br />1. Services that serve landscape irrigation only or aesthetic uses <br />2. Non- residential customers outside the city limits in compliance with the <br />provisions of individual water service agreements <br />3. Industrial 1 Institutional Users <br />4. Commercial Users <br />5. Residential Users <br />6. Public Health and Safety Facilities <br />d. Notification shall be made to the Executive Director of the Texas Commission on <br />Environmental Quality, within 5 business days of the implementation of any <br />mandatory provisions of the Drought Contingency Plan. <br />e. Update drought plan status with Texas Commission on Environmental Quality. <br />Utilize current electronic reporting method or other methods as directed by <br />TCEQ. <br />f. Activation of the La Porte EOC may be authorized by the City Manager at this <br />time. <br />G. SPECIFIC TARGETS FOR WATER USE REDUCTION <br />a. Mild Condition Goal —To achieve a voluntary 10 percent reduction in daily water <br />use. <br />b. Moderate Condition Goal - To achieve a 15 percent reduction in daily water use. <br />c. Severe Condition Goal - To achieve a 25 percent reduction in daily water use. <br />d. Critical Condition Goal — To achieve a 30 percent reduction in daily water use. <br />h <br />