My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-14-15 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2015
>
09-14-15 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2015 2:49:06 PM
Creation date
7/25/2025 3:19:49 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
9/14/2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2 <br />IV. <br />CITY has determined that adequate resourcesare available to CITY to furnish potable water <br />to COMPANYbased on the following terms and conditions, to-wit: <br />$5,000. <br />(A)COMPANYshall pay to CITY a one-time administrative fee of <br />ONE <br />(B)The total amount of potable water approved to COMPANYis established at <br />THOUSAND FIVE HUNDRED (1,500) <br />gallons per day. This number is based on an average <br />of fifty (50) gallons per employee per day as established by CITY. <br />FORTY FIVETHOUSAND SEVEN HUNDRED FIFTY <br />(C)The average monthly volume of <br />(45,750) <br />gallons is established by multiplying the average daily volume by a factor of 30.5, <br />which shall be used to facilitate CITY’S utility service billings. <br />(D)Nothing contained in this Agreement shall obligate CITY to furnish more than the average <br />FORTY FIVETHOUSAND SEVEN HUNDRED FIFTY (45,750) <br />monthly volume of <br />gallons. Repeated consumption greater than the established average monthly volume may <br />result in termination of service. <br />(E)COMPANYshall pay the standard water tap/meter fee based on CITY’S current tap/meter <br />fee schedule. Upon final approval of COMPANY’S on-site and/or off-site utility <br />construction by CITY, COMPANY shall pay the CITY’S standard water depositfee through <br />CITY’S Utility Billing Division prior to receiving water service from CITY. <br />FORTY FIVETHOUSAND SEVEN <br />(F)The cost of water up to the average monthly volume of <br />HUNDRED FIFTY (45,750) <br />gallons shall be billed at one hundred fifty percent (150%) of the <br />CITY'S rate as established from time to time for commercial customers inside its corporate <br />limits. <br />(G)The cost of water for amounts used in excess of the established average monthly volume shall <br />be billed at two hundred percent (200%) of the CITY'S rate as established from time to time for <br />commercial customers inside its corporate limits. <br />(H)COMPANYshall submit a preliminary site plan showing the total acreage of the tract including <br />present and proposed improvements and a suitable location map of the site. COMPANY’S <br />development may be subject to certain additional requirements as described in Exhibit A. <br />These requirements shall be shown on the final site plan and approved by City. <br />(I)COMPANY’S site design and site development will, in certain cases, be subject to specific <br />“Rules and Regulations”as defined in Exhibit “C” of COMPANY’S Industrial District <br />Agreement with CITY. <br />(J)All plumbing installed by COMPANYconnected to the domestic water line from CITY, shall <br />meet all applicable State of Texas and CITY plumbing code requirements. <br />(K)A reduced pressure zone backflow preventer shall be installed and maintained by COMPANY <br />to protect CITY from any possible cross-connections. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.