My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-25-16 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2016 (2)
>
01-25-16 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 1:53:58 PM
Creation date
7/25/2025 3:20:16 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BUSINESS. BY THE BAY. <br /> <br />APPLICATION PROCESS <br /> <br />Determine eligibility: Discuss project plans with the Economic Development <br />1. <br /> <br />Coordinator, and the Coordinator will set up a pre-development meeting with the <br />EGEC. <br /> <br />Complete the application and sign the agreement form. Each grant application must <br />2. <br /> <br />include the following: <br /> <br />A scaled drawing by the project architect or design professional of all the work <br />a. <br /> <br />to be completed. <br /> <br />Samples -- i.e. paint samples, fabric swatches, sign material, etc. -- that will <br />b. <br /> <br />enable the EGEC to envision the finished project. <br /> <br />Three (3) itemized work estimates on all project work from contractors or <br />c. <br /> <br />project architects. Self-contracted work will be reimbursed for actual legitimate <br />expenses, excluding labor. <br /> <br />Photographs of the buildings exterior. The Applicant shall be required to <br />d. <br /> <br />provide before and after photographs of the building before the reimbursement <br />grant can be awarded. For the initial application, before photographs will <br />suffice, but afte photographs of the completed project must be submitted <br />before the grant may be considered for reimbursement. <br /> <br />Return the completed application form, with all applicable items, to: <br />3. <br /> <br /> <br />Scott D. Livingston <br />Economic Development Coordinator <br />City of La Porte <br />604 W. Fairmont Parkway <br />La Porte, TX 77571 <br />LivingstonS@laportetx.gov <br /> <br />The application will undergo an approval process, which includes but is not limited <br />4. <br /> <br />to the following: <br /> <br />Each project must meet current building standards and codes, as well as <br />a. <br /> <br />building permit requirements. <br /> <br />The EGEC will only consider applications that have been properly and fully <br />b. <br /> <br />completed, and which contain all information requested in the application <br />and/or by the committee. <br />LA PORTE ENHANCEMENT GRANT PROGRAM <br /> <br />PAGE 4, Revised 11/11/15 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.