My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-25-16 Regular Meeting of La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2016 (2)
>
01-25-16 Regular Meeting of La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2016 1:53:58 PM
Creation date
7/25/2025 3:20:16 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Revised by Staff <br /> 16 Dec. 2015 <br /> <br />Proposed Project Criteria <br />tƌĻğƭĻ ƦƩƚǝźķĻ ƷŷĻ ŅƚƌƌƚǞźƓŭ źƓŅƚƩƒğƷźƚƓ Ʒƚ Scott D. Livingston ğƷ \[źǝźƓŭƭƷƚƓ{θƌğƦƚƩƷĻƷǣ͵ŭƚǝ ğƷ ƌĻğƭƷ ƷŷƩĻĻ ΛЌΜ <br />ǞĻĻƉƭ źƓ ğķǝğƓĭĻ ƚŅ ƷŷĻ ƦƌğƓƓĻķ ƒĻĻƷźƓŭ ķğƷĻ ǞźƷŷ ƷŷĻ .ƚğƩķ ƚŅ 5źƩĻĭƷƚƩƭ ƚŅ ƷŷĻ \[ğ tƚƩƷĻ 5ĻǝĻƌƚƦƒĻƓƷ <br />/ƚƩƦƚƩğƷźƚƓʹ <br />Њ͵ŷƚ źƭ CźƭĭŷĻƩƭ IğƩķǞğƩĻͪ ŷğƷ ķƚĻƭ CźƭĭŷĻƩƭ IğƩķǞğƩĻ ķƚͪ <br /> <br />Fischers Hardware is in the business of retail sales providing product and services to La Porte and <br />surrounding areas. <br />Ћ͵ŷğƷ ķƚĻƭ CźƭĭŷĻƩƭ IğƩķǞğƩĻ Ǟźƭŷ Ʒƚ ķƚ źƓ \[ğ tƚƩƷĻͲ Ļǣğƭͪ tƌĻğƭĻ ĻǣƦƌğźƓ ƷŷĻ ƭĭƚƦĻ ƚŅ ƷŷĻ ƦƩƚƦƚƭĻķ <br /> <br />ƦƩƚƆĻĭƷ źƓ \[ğ tƚƩƷĻͲ Ļǣğƭ͵ tƌĻğƭĻ ƭǒĬƒźƷ ğ ƭźƷĻ ƦƌğƓͲ ĻƌĻǝğƷźƚƓ ƩĻƓķĻƩźƓŭΛƭΜͲ ƦźĭƷǒƩĻƭͲ ğƓķΉƚƩ ğ ķĻƷğźƌĻķ <br />ǝĻƩĬğƌ ķĻƭĭƩźƦƷźƚƓ ƚŅ ƷŷĻ ķĻƭźƩĻķ ƦƩƚƆĻĭƷ ǞźƷŷ Ʒŷźƭ ŅƚƩƒ͵ <br /> <br /> $611,559.28 to expand <br />their existing business in La Porte, TX͵ The owners will use the funds to remodel both the interior and <br />exterior of the building to provide an updated appearance by completing the following projects: <br />Remove the existing metal fascia on the entire perimeter of the building, <br /> <br />Install a new framework and new stucco fascia panels, <br /> <br />Remove the awning from the southwest side of the building, <br /> <br />Install kneewall stone fascia, <br /> <br />Install a black wrought iron fence, <br /> <br />Add paint and signage to the new structures, <br /> <br />Remove the block wall between the existing build and Little Jacks to increase square footage by <br /> <br />15,000 square feet, <br />Add new, interior fixtures & lumber fixtures for expansion, <br /> <br />Add new, interior signage and fixtures, <br /> <br />Repaint the pole sign and add new graphic signage. <br /> <br />Re-seal and re-strip the parking lot, <br /> <br />Re-pave the area which is currently covered on the south side of the building, and <br /> <br />Add new flower beds and landscaping, including a block flower bed at the bottom of the exterior <br /> <br />sign pole and add stucco finish to match the building. <br />Ќ͵ŷĻƩĻ ķƚĻƭ CźƭĭŷĻƩƭ IğƩķǞğƩĻ Ǟźƭŷ Ʒƚ ķƚ ĬǒƭźƓĻƭƭ źƓ \[ğ tƚƩƷĻͲ Ļǣğƭͪ <br /> <br /> <br />Fischers Hardware will operate in its current location. <br /> <br />Ѝ͵ŷĻƓ ķƚĻƭ CźƭĭŷĻƩƭ IğƩķǞğƩĻ Ǟźƭŷ Ʒƚ ƭƷğƩƷ ğƓķ ŅźƓźƭŷ ƷŷĻ ƦƩƚƦƚƭĻķ ƦƩƚƆĻĭƷͪ <br /> <br /> <br />Fischers Hardware would like to start the project as soon as possible and have the project <br />completed within six months. <br /> <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.