Laserfiche WebLink
CIP (Streets, Utilities, Drainage) <br />AIJKLMAF <br />176 <br />177 <br />178 <br />179 <br />180 <br />2019-20 <br />181 <br />182 StreetUtility DrainGrantTotalComments <br />183 CIPCIPFeeor Bond <br />184($1000)($1000)($1000)($1000)($1000) <br />185 FY 2020 <br />186 <br />187 <br />188 <br />189 200200550950$550K CDBG Grant for Streets/Drainage <br />Contruct N. 6th Phase 2 (West Tyler to Barbours Cut) (Northside) <br />Asphalt Streets Reclaimed/Surfaced: TBD. Utilize FY 17 Street <br />190 700 <br />700 <br />Inspection. <br />191 250250 <br />Concrete Street Repair - Remove/Replace (Small Sections) <br />192 4040 <br />Concrete Street Repair - Slab Jacking (Small Sections) <br />193 5050 <br />Street Repair Materials (City Crew Construction) <br />194 150150 <br />Sidewalk Replacement & Handicap Ramps, <br />195 <br />196 0 <br />197 0 <br />198 Utility Only Projects0 <br />199 <br />200 Sewer Rehabilitation (SSO Plan)350350 <br />201 Water line replacement In-house 4545 <br />202 4040 <br />203 Contract Water Main Replacement (TBD)400400 <br />204 Valve Replacement2525 <br />205 Paint Lomax Water Tower Interior/Exterior475475 <br />206 Lift Station Improvements3535 <br />207 Hillridge Water Plant Improvements Phase III400400 <br />208 Commercial Water Meter Replacement3030 <br />209 Utility Contingency0 <br />210 0 <br />211 0 <br />212 0 <br />213 Drainage Only Projects0 <br />214 <br />215 Drainage Materials for City Crews5050 <br />216 TV Inspection Storm Sewer System3030 <br />217 0 <br />218 Streets/Drainage Contingency8025105 <br />219 <br />220 <br />221 <br />222 <br />223 <br />224 <br />225 FY 2020 Annual Expenditure Total$1,270$2,000$305$550$4,125 <br />226 <br />227 <br />228 <br />229 <br />230 <br />231 <br />232 <br />233 <br />234 <br /> <br />3/29/2016 <br /> <br />