Price
<br />Extended
<br />Contracting
<br />Price
<br />ISI
<br />Unit
<br />Price
<br />Extended
<br />Industries
<br />Price
<br />RAC
<br />Unit
<br />Price
<br />Concrete
<br />Extended
<br />Price
<br />Phillips
<br />Unit
<br />GW
<br />Price
<br />Extended
<br />Concrete
<br />Price
<br />Brooks
<br />inc
<br />Price
<br />$269,779.00$330,069.76$336,034.00$380,714.80$464,206.00
<br />Services,
<br />PriceExtended
<br />Precise
<br />Unit
<br />LF1780$3.65$6,497.00$6.55$11,659.00$6.00$10,680.00$7.00$12,460.00$4.00$7,120.00LF100$3.65$365.00$6.76$676.00$7.00$700.00$10.00$1,000.00$6.00$600.00LF100$33.00$3,300.00$20.80$2,080.00$6.00$600.00$21.0
<br />0$2,100.00$5.00$500.00LS6$750.00$4,500.00$520.00$3,120.00$1,500.00$9,000.00$1,610.00$9,660.00$3,000.00$18,000.00LF100$7.50$750.00$7.80$780.00$8.00$800.00$7.00$700.00$12.00$1,200.00
<br />SY3094$10.50$32,487.00$8.24$25,494.56$18.00$55,692.00$7.00$21,658.00$33.00$102,102.00SY320$29.00$9,280.00$14.56$4,659.20$18.00$5,760.00$9.00$2,880.00$42.00$13,440.00SY3094$50.00$154,700.00$69.00$213,
<br />486.00$58.00$179,452.00$79.70$246,591.80$76.00$235,144.00SY100$23.75$2,375.00$8.24$824.00$12.00$1,200.00$5.10$510.00$14.00$1,400.00SY700$55.25$38,675.00$72.80$50,960.00$68.00$47,600.00$99.20$69,440.0
<br />0$78.00$54,600.00SF100$7.00$700.00$6.89$689.00$58.00$5,800.00$10.00$1,000.00$9.00$900.00SF100$5.00$500.00$5.89$589.00$7.00$700.00$10.00$1,000.00$8.00$800.00SY100$5.00$500.00$4.16$416.00$6.50$650.00$6
<br />.00$600.00$5.00$500.00
<br />EA6$200.00$1,200.00$200.00$1,200.00$450.00$2,700.00$115.00$690.00$300.00$1,800.00EA6$200.00$1,200.00$155.00$930.00$700.00$4,200.00$230.00$1,380.00$250.00$1,500.00
<br />Ton150$38.50$5,775.00$41.69$6,253.50$35.00$5,250.00$31.30$4,695.00$84.00$12,600.00Ton150$46.50$6,975.00$41.69$6,253.50$35.00$5,250.00$29.00$4,350.00$80.00$12,000.00
<br />Place)
<br />in
<br />(7
<br />CurbAsphalt
<br />Complete
<br />In
<br />Material,
<br />Curb,
<br />to
<br />Material
<br />Subgradeand
<br />city
<br />(RCCB,
<br />and
<br />Repairs
<br />complete
<br />(per
<br />Concrete
<br />Pavement
<br />Complete
<br />Including
<br />ConcreteComposite
<br />(Concrete
<br />Base
<br />(2'X5')
<br />Sidewalk
<br />types
<br />Driveways,12
<br />Sidewalks
<br />Street(CSS,
<br />Curb
<br />2016 Driveways
<br />Pavement
<br />(All
<br />subgrade
<br />DescriptionUnitQuantityUnit
<br />and
<br />Sawcut
<br />Concrete
<br />TypeType
<br />Header
<br />Reinforced
<br />of
<br />pattern
<br />10,
<br />Sand
<br />Pavement
<br />Concrete
<br />ITEMS
<br />Item
<br />Roadway,
<br />Ramps
<br />inch
<br />Pavement
<br />Concrete
<br />May
<br />Strenth
<br />Concrete
<br />PavementPavement
<br />Concrete
<br />WarningWarning
<br />UNIT Pavement
<br />transitions)
<br />Driveways,
<br />Curb,2.35
<br />PavementCurb
<br />(BayForest)Crushed
<br />(Greenleaf)
<br />Concrete10"
<br />Mountable
<br />Stabilized
<br />Excavation
<br />16 Early
<br />Date:
<br />BID
<br />Porte
<br />ConcreteRed,
<br />12"
<br />FY Depth
<br />ConcreteOverHighReinforcedxConcrete
<br />Place)
<br />La
<br />BASE RemoveRoadway,RemoveIncludingSidewalk6"6"direction)CementRecycledIn6"sack/CY)6"4"6"4.5"ConcretepavementConcreteplace)SoddingFullDetectable(2'X5')DetectableClayTotal
<br />of
<br />Opening
<br />Porte
<br />123456789
<br />1011121314151617
<br />No.
<br />Item
<br />CityLa
<br />BidA.
<br />
<br />
|