Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEMREQUEST FOR CITY COUNCIL AGENDA ITEM <br />July 25, 2016July 25, 2016AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />051051 <br />Sharon ValianteSharon ValianteSource of Funds:Source of Funds: <br />Requested By:Requested By: <br />051051--70717071--531531-- <br />Public WorksPublic Works <br />Department:Department: <br />Account Number:Account Number: <br />11001100 <br />Report:Resolution:Resolution:Ordinance:Ordinance: <br />$1,100,000.00$1,100,000.00 <br />Amount Budgeted:Amount Budgeted: <br />Other: <br />$714,129.30$714,129.30 <br />Amount Requested:Amount Requested: <br />AttachmentsAttachments : : <br />Budgeted Item:Budgeted Item:YESYESNONO <br />1. Bid Recommendation and Tabulation Bid Recommendation and Tabulation <br />2. Tolunay Tolunay--Wong Proposal for Materials Wong Proposal for Materials <br />TestingTesting <br />3. Access Report Access Report <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />City Council authorized a design services contract with LJA Engineering in the amount of $79,500 with a City Council authorized a design services contract with LJA Engineering in the <br /> amount of $79,500 with a <br />$3,450 contingency on March 10, 2014 for the design of the Scotchmoss Lane roadway improvements.  $3,450 contingency on March 10, 2014 for the design of the Scotchmoss Lane roadway improvements.  <br /> <br />Staff provided Council with a construction estimate equal to $950,000 with the 2014 design services Staff provided Council with a construction estimate equal to $950,000 with the 2014 <br /> design services <br />agenda request. Tonightagenda request. Tonight’’s request is to authorize project construction with a total funding allocation s request is to authorize project construction with a total <br /> funding allocation <br />equal to $714,129.30.   equal to $714,129.30.    <br />Bid #16011 for the Scotchmoss Lane Rehabilitation was opened and read on June 21, 2016.  The bid Bid #16011 for the Scotchmoss Lane Rehabilitation was opened and read on June 21, 2016.  <br /> The bid <br />was advertised in the Bay Area Observer on May 26 & June 2, posted on Public Purchase and the Citywas advertised in the Bay Area Observer on May 26 & June 2, posted on Public Purchase <br /> and the City’s <br />website. Fourteen vendors accessed the bid, and 1 bid was received. Marwebsite. Fourteen vendors accessed the bid, and 1 bid was received. Mar--Con Construction submitted Con Construction <br /> submitted <br />the bid at $673,974.30, which includes the base bid ($619,916.30) and Supplementary Bid Items the bid at $673,974.30, which includes the base bid ($619,916.30) and Supplementary Bid <br /> Items <br />($54,058.00). Mar($54,058.00). Mar($54,058.00). Mar($54,058.00). Mar----Con has successfully completed construction projects for the City of La Porte in the Con has successfully completed <br /> construction projects for the City of La Porte in the Con has successfully completed construction projects for the City of La Porte in the Con has successfully completed construction <br /> projects for the City of La Porte in the <br />past.    <br />The Supplementary Work Items are typical construction materials (cement stabilized sand and 7 sack The Supplementary Work Items are typical construction materials (cement stabilized <br /> sand and 7 sack <br />concrete) that would expect to see an concrete) that would expect to see an ““overover--runrun””or in place of another material and will be used only if or in place of another material <br /> and will be used only if <br />necessary to expedite construction.   necessary to expedite construction.    <br />Contingency:  Staff is requesting a $33,700 contingency equal to 5.0%.   Contingency:  Staff is requesting a $33,700 contingency equal to 5.0%.    <br />Materials Testing:  TolunayMaterials Testing:  Tolunay--Wong Engineers, Inc. submitted a price proposal for subgrade and concrete Wong Engineers, Inc. submitted a price proposal for <br /> subgrade and concrete <br />testing in the amount of $6,455.00.  As professional engineers, Tolunaytesting in the amount of $6,455.00.  As professional engineers, Tolunay--Wong Engineers, Inc. falls Wong Engineers, <br /> Inc. falls <br />within the purchasing category of Professional Services.  Selection of this firm was conducted via within the purchasing category of Professional Services.  Selection of this firm was <br /> conducted via <br />rdrd <br />separate RFQ process as part of the 3separate RFQ process as part of the 3 Street project.    Street project.    <br />Final Project Cost:  $673,974.30 total bid + $33,700.00 contingency + $6,455.00 materials testing = Final Project Cost:  $673,974.30 total bid + $33,700.00 contingency + $6,455.00 materials <br /> testing = <br />$714,129.30.  $714,129.30.   <br />Benefits:    <br />The project will address several of the lowest rated concrete street segments identified in the 2013 The project will address several of the lowest rated concrete street segments identified <br /> in the 2013 <br />comprehensive street inspection report. comprehensive street inspection report.  <br /> <br />