Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: June 25, 2018 <br />Requested By: Don Pennell <br />Department: Public Works <br />Report: Resolution: :Ordinance: <br />Exhibits: Bid Tab <br />Contract Award Recommendation <br />Source of Funds: <br />Budget <br />003/015/050 <br />Account Number: 003-7071-531-1100 <br />015-7070-530-1100 <br />015-7071-531-1100 <br />050-7071-531-1100 <br />Amount Budgeted: $1,885,789 <br />Amount Requested: $1,379,296 <br />Coov of Bid Access Report <br />Budgeted Item: YES NO <br />SUMMARY & RECOMMENDATION <br />SomertonNenture: <br />The FY 17 & 18 budgets includes an allocation for the design and construction of Somerton infrastructure <br />improvements which includes replacing existing waterline and pavement from the Bandridge Water Plant to <br />Spencer Highway. The existing waterline is an 8 inch asbestos cement waterline that is identified for upsizing to <br />a 12 inch PVC waterline in the 2009 Water Master Plan. The Venture waterline will create an additional loop in <br />the water system also identified in the 2009 Water Master Plan. The Somerton pavement rating in the 2013 <br />assessment was rated at 40 percent replacement. The pavement was crack sealed at the time to extend the life of <br />the pavement. <br />Pecan Park: <br />The FY 17 budget includes an allocation for the construction of additional parking spaces at Pecan Park. This <br />project includes the installation of approximately 123 additional parking spaces at Pecan Park. The proposed <br />spaces will be located in the northeast corner of the park and infill spaces at locations underutilized. <br />City Council authorized a design services contract with Binkley Barfield on May 22, 2017 for the design of the <br />Somerton Drive Waterline and Pavement Replacement, Venture Lane Waterline, and Pecan Park Parking Lot <br />Project in the amount of $200,000.00. <br />Bid 418018 Somerton Drive Waterline and Pavement Replacement, Venture Lane Waterline and Pecan Park <br />Parking Lot was opened and read on May 24, 2018, 5 bids were received. Notice to Bidders was advertised on <br />May 3rd & May 101h in the Bay Area Observer, posted on Public Purchase and the City's website, 22 vendors <br />accessed the bid documents. Mar -Con Services, LLC. submitted the lowest and best total bid at $1,295,113.70. <br />Staff recommends awarding the bid to Mar -Con Services, LLC. <br />Contingency: Staff is requesting an $84,182.00 contingency equal to 6.5%. <br />Benefits: <br />