My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-08-18 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2018 (2)
>
10-08-18 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2018 12:03:09 PM
Creation date
7/25/2025 3:26:05 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
10/8/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HarrisCountyEngineeringDepartment <br />10555 NORTHWEST FREEWAY, SUITE 120, HOUSTON, TX OFFICE 713-274-3900 <br />ROW NOTIFICATION FOR SOIL BORINGS <br />Date Issued:07/30/2018 Construction Started By:1/26/2019 <br />Issued To:Exxon Mobil Pipeline CO.Project Name:Webster - Baytown TX-63E <br />Owner:Exxon Mobil Pipeline CO.Notification No:1807260120-SB-001 <br />Applicant:EXXONMOBIL PIPELINE COMPANY <br />Contact:Daniel Wisner <br />Contact Email:DANIEL.J.WISNER@EXXONMOBIL.COM <br />Contact Phone:(832) 624-8815 <br />Property Information <br />Address:0 W Main Street Bldg:Suite:Trailer: <br />City:LA PORTE State: TX Zip:77571 <br />Subdivision:ROW Notification Section:0 Lot:Block:Reserve: <br />Abstract No.:Survey Name: <br />REQUIRED INSPECTION(S) <br />IT IS YOUR RESPONSIBILITY TO CALL FOR ALL REQUIRED INSPECTIONS <br />(*) All Inspections designated with an asterisk must be passed before permanent power will be released. <br />1Construction Start-Utility <br />2Construction Complete-Utility <br />PRE-INSPECTION DOCUMENT(S) <br />ALL PRE-INSPECTION DOCUMENTS MUST BE RECEIVED AND APPROVED BEFORE INSPECTIONS CAN BE REQUESTED <br />SPECIAL REQUIREMENT(S) <br />1Schedule Inspection(s) By Logging Into Your Online Account (e-Permits), Selecting Inspections - Inspection Request, And Select The Inspection <br />You Would Like To Request; You may also fill out the online request form at <br />http://www.eng.hctx.net/permits/Development/Development/Inspection-Request; Or By Calling 713-274-3800. All Site, Storm Water Quality, On- <br />site Sewerage Facility and Right of Way Inspections must be PASSED and Permanent Power Released before requesting your Fire Marshal <br />Inspection. <br />2All Construction Shall Be In Accordance With The Approved And Permitted Documents, Any Special Details Will Be Noted On Approved Plans <br />Permit Manager <br />Main Line HCPID 713-274-3900Schedule Inspections 713-274-3800Fire Code Inspections 281-436-8000 <br />This certification is not transferable, and is effective immediately. The document certifies that notification has been given to Harris County that User will construct, install, modify, <br /> or repair a facility as defined by the <br />notification and plans submitted to County Engineer in support of this certification. If construction does not begin within (six (6) months) or is not completed within (nine (9) months) <br /> from the date of this certification, <br />a new notification and certification shall be required. Authority for issuance of this of this certification is derived from the Harris County Road law (Section 2 of Acts 1913, 33rd <br /> Leg., Ch. 17 Tex. Gen. Laws p. 64), <br />as amended, the Rules of Harris County and the Harris County Flood Control District for the Construction of Facilities within Harris County and Harris County Flood, Control District <br /> Rights-of-Way (the Rules), and <br />other rights given to property owners in this state.This certification is issued for the installation, construction, modification, or repair at the location(s) shown below by User in <br /> strict conformity with the plans and <br />information filed with the County Engineer as part of the notification.This certification should be posted at the worksite in accordance with section 9 (VI) of the Rules. Failure to <br /> comply with this certification or the <br />Rules may result in enforcement proceedings before Commissioners Court, job shutdown, or a Class C misdemeanor charge.If User wishes to deviate from the information on file with the <br /> County Engineer, <br />supplemental plans must be filed with the County Engineer and the County Engineer's certification of the change must be secured prior to beginning work.User is responsible for notifying <br /> the County Engineer and <br />appropriate Commissioners Precinct by calling the telephone numbers listed below forty-eight (48) hours before work is to progress. A copy of this certification and the approved drawings <br /> must be kept onsite at all <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.