My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-28-19 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2010's
>
2019 (2)
>
01-28-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2019 12:19:18 PM
Creation date
7/25/2025 3:26:29 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
1/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
reimbursed to GCA by the City upon its receipt of proper documentation thereof, exclusive of any other charge <br />or fee provided herein. Such metering and monitoring devices shall include, but not be limited to, continuous <br />volume meters, continuous composite samplers, pH monitors, and any other devices deemed by GCA to be <br />necessary to provide accurate measurements of the volume and strength of wastewater. The City shall be entitled <br />to furnish additional data or request additional tests or measurements from GCA at the City's expense. All <br />metering equipment shall be checked and calibrated by GCA, in the presence of a representative of the City, at <br />approximately six-month intervals (or more often if reasonably requested by either party) for the purpose of <br />determining the accuracy thereof, and adjustments shall be made to correct any inaccuracy found to exist. <br />Provided, however, in the event the City is duly notified at least twenty-four (24) hours in advance of the time at <br />which a test or calibration is to be made, and the City's representative fails to appear at such designated time, the <br />results of such tests and calibrations shall be binding upon the City. In the event a test or calibration (conducted <br />according to accepted industry procedures) shows an error of more than five percent (5%), plus or minus, the <br />volume of wastewater delivered shall be corrected for a period extending back to the time such inaccuracy <br />occurred, if such time is ascertainable or, if not ascertainable, for a period extending back one-half (1/2) of the <br />time that has elapsed since the most recent previous test and calibration. <br />IV. <br />Charges <br />4.01. Treatment and Disposal. A monthly treatment and disposal charge shall be paid by the City to <br />GCA, which charge shall be calculated, based upon the readings of the metering and monitoring devices, as <br />provided in Section 3.01 above. The City hereby covenants and agrees that it will: (a) establish, maintain, and <br />from time to time, if necessary, adjust the rates, fees, and charges for the service provided by its sanitary sewage <br />system or combined waterworks and sanitary sewage systems; and/or (b) assess, levy, and collect taxes upon all <br />taxable property within the City in whatever amount may be necessary to pay the obligations of the City hereunder <br />and all such other expenses or costs of operating and maintaining such systems. <br />Monthly treatment and disposal charges shall be paid by the City in accordance with the following rates <br />per 1,000 gallons of Domestic Sewage/Municipal Waste: <br />Rate: For flows of: <br />$0.20 500,000 gallons per day or less <br />$0.40 500,001 to 600,000 gallons per day <br />$0.60 600,001 to 800,000 gallons per day <br />$0.80 800,001 to 1,000,000 gallons per day <br />5 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.