Laserfiche WebLink
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested: July 8, 2019 <br /> <br />Source of Funds: 051-7071-531-1100 <br />Requested By: <br />Lorenzo Wingate <br /> <br />Department: <br />Public Works <br />Account Number: 051-7071-531-1100 <br />$150,000 (budgeted) <br />Report Resolution Ordinance <br />Amount Budgeted: $112,301 (remaining) <br /> <br /> <br /> <br />Amount Requested: $59,530.00 <br />Exhibits: proposal <br /> <br /> Budgeted Item: Yes No <br /> <br /> <br />SUMMARY <br /> <br />The GLO-CDR has allocated <br />and MOD Amendments No. 1 and 2 from the 2015 Floods CDBG-DR funds for infrastructure that failed <br />to function during the declaration period and improvements that principally benefit those of low and <br />moderate income areas. To access the funding allocated to the City of La Porte, the GLO required <br />submission of a Non--housing projects to <br />repair or mitigate damage that occurred during the Presidentially-declared Federal Emergency <br />Management Agency (FEMA) 4223-DR-TX (2015 Memorial Day) and FEMA 4245-DR-TX (2015 <br />Halloween) disasters. The Northside Neighborhood Drainage Improvement Project (also referred to as <br />th <br />the 6 Street Drainage Improvements from Madison to Main), within the Little Cedar Bayou (F216) <br />Watershed, was awarded funding effective March 9, 2019, with a termination date of August 5, 2021. <br /> <br />The goal of the Northside Neighborhood Drainage Improvement Project is to improve the functionality of <br />the storm sewer system and increase the level of service in the region. Based on a previous study, further <br />drainage analysis was necessary to develop the most efficient flood reduction efforts. Given the <br />anticipated scope of proposed improvements and the potential for additional grant funding to supplement <br />the anticipated construction cost, this project will be completed in phases, with this phase providing for <br />the identification of improvements necessary to mitigate flooding and design and construction of the <br />necessary ultimate outfall structure. <br /> <br />RFQ #19601 for Engineering Services for Grant Projects was advertised on October 25, 2018, with a <br />closing date of November 20, 2018. Seventeen (17) firms submitted responses. The top four firms - <br />5Engineering, LLC; AECOM Technical Services, Inc.; Halff Associates, Inc.; and Lockwood Andrews & <br />Newnam, Inc. - were short-listed by the evaluation committee and are considered to be the most qualified <br />respondents for drainage related grant projects. Lockwood, Andrews, & Newnam, Inc. submitted a <br />proposal for preliminary engineering services for the Northside Neighborhood Drainage Improvement <br />Project in the amount of $59,530.00. <br /> <br /> <br />