Laserfiche WebLink
College Station, TX U N H A M Phone: (979) 590-6555 <br />McAllen, TX N C I N EE R I N G Fax: (979)690.7034 <br />Oklahoma City, OK 0 TX Registrationk: E-2253 <br />INSPECTION. 13ESION. RESi1L:1S. www.DunhamEnginearing.com <br />Letter of Agreement <br />This is an Agreement made as of 2019 between City of LaPorte, 'Texas <br />hereinafter known as the OWNER acrd Dunham Engineering, Inc. of College Station,Texas <br />hereinafter known as the ENGINI ER. <br />The OWNI'R intends for the ENGINEER to perform professional engineering service in the design <br />and construction inspection of the WORK <br />The WORK is defined as the Replacement of Hillridge Water Storage "Tank also known as Fairmont <br />Booster Station in La Portc,'I'cxas. <br />WORK includes demolition of existing bolted steel tank, refurbishing of existing foundation and <br />erection of new similar sized epoxy coated bolted steel tank. Estimated contractor cost is $200,000. <br />PHASE I- DESIGN <br />The ENGINEER agrees to prepare the design, produce engineering plans and specifications, prepare <br />the contract documents, advertise for bids to selected contractors and recommend award of a lump <br />sum construction contract to complete the WORK for the O'vVNE'R. <br />'The ENGINEER agrees to provide a draft set of contract documents to the OWNER for review and <br />approval no later than 30 days from the date of the Agrecmcnt. <br />The I'NGINEER agrees to finalize the documents and advertise the WORK to selected contractors for <br />bid within 30 days after receipt of OWNER'S comments and approval. <br />The OWNI? <br />