My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-13-20 Regular Meeting of the La Porte City Council (2)
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2020
>
01-13-20 Regular Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 4:15:06 PM
Creation date
7/25/2025 3:28:03 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
1/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:January 13, 2020 <br />Source of Funds:General Fund CIP <br />Requested By: Rosalyn Epting, Director <br />Department: Parks & Recreation <br />Account Number: 015-8080-552.11-00 <br />Amount Budgeted: $500,000 <br />ReportResolution Ordinance <br />Amount Requested: $205,455.13 <br />Exhibits: Bid Tabulation, Access Report, and <br />Budgeted Item:Yes No <br />Lessman Roofing Bid <br />SUMMARY <br /> <br />The Recreation & Fitness Center roof has outlived its useful life, and we are experiencing leaks <br />in multiple areas. Upon inspecting the roof, we will not be able to make spot repairs; therefore, <br />replacement is necessary. As you may be aware, the City is in the process of a needs <br />assessment for this facility. Regardless of the outcome of this assessment, there will be a plan <br />for future use of this facility. The consultant is aware that we will be putting on a new roof and <br />the new roof is imperative to maintain the building’s structure for future uses. <br /> <br />Bid # 20006 for the Recreation & Fitness Center Roof Replacement was opened and read on <br />December 12, 2019. Four (4) bids were received. The ‘Notice to Bidders’ was advertised in <br />thst <br />the November 14& 21 editions of the Bay Area Observer, posted on Public Purchase and <br />the City’s website. Thirty-eight (38) vendors downloaded the bid documents. <br /> <br />Lessman Roofing and Sheetmetal LLC submitted the lowest bid in the amount of $186,777.13. <br />References have been checked, and all are favorable. The new roof would carry a 20-year <br />manufacturer’s warranty and a two (2) year workmanship warranty. The project schedule will <br />be determined during the pre-construction meeting. This is a lump sum bid; therefore, the <br />contractor will not receive payment until the project is completed. <br /> <br />Funding for this project will come from the $500,000 of Economic Development Corporation <br />(EDC) Funds that were set aside in fiscal year 2018 for design of the Recreation & Fitness <br />Center Renovation project. The funds for this project were transferred from the EDC Fund to <br />the General Capital Improvement Project Fund. Of the $500,000 that is budgeted, $92,661.50 <br />has already been used for design fees, the needs assessment, and a roof engineer. There is <br />$407,338.50 remaining in this budget. <br /> <br />Staff recommends awarding Bid #20006 to Lessman Roofing and Sheetmetal LLC in the <br />amount of $186,777.13 and allow a 10% construction contingency of $18,678. Total <br />authorization for the replacement of the Recreation andFitness Center roof will be $205,455.13. <br />RECOMMENDED MOTION <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.