My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-13-20 Regular Meeting of the La Porte City Council (2)
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2020
>
04-13-20 Regular Meeting of the La Porte City Council (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2022 12:02:08 AM
Creation date
7/25/2025 3:28:35 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
4/13/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
205
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. RETROFIT PROG13AMS <br />The City of La Porte makes information available through its education program <br />for Plumbers and customers to use when purchasing and installing plumbing <br />fixtures, lawn watering equipment, or water using appliances. Informatbn <br />regarding retrofitting devices such as low -flow shower heads or toilet dams that <br />reduce water use by replacing or modifying existing fixtures or appliances will also <br />be provided. <br />4. UNIVERSAL METERING <br />The City of La Porte currently meters all water sales from its system, with the <br />exception of a few public uses. All wells are currently metered at the well <br />head. Well production meters and surface water meters are tested on an <br />annual basis. The !source water meters are maintained within an accuracy of plus <br />or minus 5%. Based on the results of the accuracy tests, the meters are <br />calibrated, repaired or replaced as needed. Universal metering is a standard of <br />this utility will be an element of this plan. <br />1, 1 0- ft" 2W.18IM-STAMMM <br />5. WATER RATE STRUCTURES <br />The City of La Porte has adopted an Increasing Block Rate structure. A copy of <br />the current water rate structure is attached in Appendix B and is made part of the <br />Water Conservation Plan. <br />6. METER REPAIR AND REPLACEMENT <br />The City of La Porte Gurr tly owns an perate,6--equiprnept.4,G�F small meter <br />testing. The testing of large meters Meter testing is conducted by contract <br />forces. The meter repair and testing program is structured per AWWA <br />recommendations as follows: <br />I , Major Production meters - test once per year <br />2. Meters larger than four inch — random testing every 5 years <br />3. Meters larger than one inch - random testing every 7 years <br />4. Meters smaller than one inch - random testing every 10 years <br />In addition, the City will verify that each meter in the system is properly sized for <br />the average volume of water being used in accordance with the manufacturers' <br />specification for the meter. Based on testing and field evaluation, meters are <br />repaired or replaced as needed. Large meter (1 inch and larger) replacement is <br />prioritized based on usage volume, functionality and age. Residential meter <br />replacement is prioritized based on functionality and age. <br />Revised 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.