Laserfiche WebLink
<br />SECTION 4 <br />ACCEPTANCE TEST PLAN <br />Testing of the proposed equipment is included. This includes the following: <br /> Verify the operational functionality and features of the individual subsystems by Motorola, as contracted. <br /> Motorola shall test the key console features such as (i.e. but not limited to): <br /> TG calls / patches / MSEL <br /> Emergency <br />A detailed Acceptance Test Plan will be developed upon purchase and will be reviewed during the <br />implementation phase. <br />City of La Porte May 2020September 26, 2017 <br />IP Base Console Upgrade Use or disclosure of this proposal is subject <br />to the restrictions on the cover page. <br /> Motorola Solutions Confidential Restricted Table of Contents 4-i <br /> <br />