My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-12-21 McLarrin sworn
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
04-12-21 McLarrin sworn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 12:43:13 AM
Creation date
7/25/2025 3:30:34 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
4/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Agenda Date Requested: April 12, 2021 <br />Requested By: Ray Mayo, Director <br />Department: Public Works <br />• Report Resolution Ordinance <br />Exhibits: Interlocal Agreement, Project Exhibit A, <br />Project Scope and Fundinq Structure Exhibit B, <br />HC Commissioners Court Order <br />Appropriation <br />Source of Funds: <br />015- General Fund <br />Account Number: <br />015-7070-530-1100 <br />Amount Budgeted: <br />$1,500,000 <br />Amount Requested: <br />$1,000,000 <br />Budgeted Item: <br />Yes No <br />SUMMARY & RECOMMENDATION <br />The project details and funding share plan for the Fairmont Parkway Signalization <br />Project was proposed to City Staff in 2016. The project was to be performed in two <br />phases. Phase I included re -design of intersections, installation of new traffic signals <br />and underground fiber optic cable along Fairmont Parkway from 7t" Street to Beltway <br />8. Phase 11 includes modification of traffic signals and synchronization of all traffic <br />signals to improve traffic flow. Funds for the La Porte section of the project were <br />budgeted in the FY 16-17 budget. <br />The attached interlocal agreement provides a mechanism for Harris County to finalize <br />the project, with La Porte participating with Harris County for a maximum amount of <br />$1,000,000.00. This is equal to 14.6% of the entire project costs ($6,855,550) and <br />29.5% of the local share amount ($3,387,910). <br />Additionally, Harris County is currently considering the feasibility of widening Fairmont <br />Parkway to provide one (1) additional travel lane in each direction. The feasibility <br />assessment is being prepared as a preliminary engineering report (PER) and is <br />approximately eighty-five percent (85%) complete. Preliminary project costs are <br />anticipated to range between $30,000,000 and $40,000,000. At this time, no <br />consideration has been given to the City assisting with funding for the widening of <br />Fairmont Parkway. <br />Benefits: <br />0 Improved traffic flow <br />
The URL can be used to link to this page
Your browser does not support the video tag.