My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-12-21 McLarrin sworn
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
04-12-21 McLarrin sworn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 12:43:13 AM
Creation date
7/25/2025 3:30:34 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
4/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
percentage increases in customer's base rate bills. Base rates cover CenterPoint's cost <br />excluding the cost of gas and are the costs that are directly within CenterPoint's control. <br />• Increase in Average Customer's Bill: <br />o Residential Customer: 4.95% <br />o Commercial Customer: 6.33% <br />o General Services —Large Volume: 12.61 % <br />"GRIP" Rate Application <br />Under section 104.301 of the Gas Utility Regulatory Act ("GURA"), a gas utility is <br />allowed to request increases in its rates to recover a return on investments it makes <br />between rate cases. This section of GURA is commonly referred to as the "GRIP" <br />statute, that is, the "Gas Reliability Infrastructure Program." <br />Under a decision by the Supreme Court of Texas, the Court concluded that a filing <br />made under the GRIP statute permitted gas utilities the opportunity to recover return <br />on capital expenditures made during the interim period between rate cases by applying <br />for interim rate adjustment and that proceedings under the GRIP statute did not <br />contemplate either adjudicative hearings or substantive review of utilities' filings for <br />interim rate adjustments. Instead, the Court concluded, the GRIP statute provides for <br />a ministerial review of the utility's filings to ensure compliance with the GRIP statute <br />and the Railroad Commission's rules, and that it is within the Railroad Commission's <br />authority to preclude cities from intervening and obtaining a hearing before the Railroad <br />Commission. <br />Alliance of CenterPoint Municipalities <br />In about 2007, coalition of cities known as the Texas Coast Utilities Coalition ("TCUC") <br />of cities was formed by the Cities of Angleton, Baytown, Clute, Freeport, League City, <br />Pasadena, Pearland, Shoreacres, West Columbia, and Wharton to coordinate their <br />efforts in reviewing the rates, services, and operations of CenterPoint Energy <br />Resources Corp., Texas Coast Division ("CenterPoint") within each City's respective <br />boundaries. TCUC has been represented by the law firm of Herrera Law & Associates, <br />PLLC (through Mr. Alfred R. Herrera) to assist in reviewing applications to change rates <br />submitted by CenterPoint since formation of TCUC. <br />The City of La Porte is part of other similar coalitions with regard to CenterPoint Energy - <br />Houston Electric ("CEHE"), but is not participating in a group of similarly situated cities <br />with regard to CenterPoint's gas -utility services. Joining in TCUC will benefit both La <br />Porte and TCUC through addition of another city voice in the review of gas -utility rates, <br />services, and operations in CenterPoint's Texas Coast Division. <br />Currently, there are no fees or other dues applicable for joining TCUC. TCUC's primary <br />focus is in rate cases involving CenterPoint. On a case -by -case basis, and as directed <br />by TCUC, TCUC will solicit funding for projects outside of the ratemaking arena <br />
The URL can be used to link to this page
Your browser does not support the video tag.