Laserfiche WebLink
C'4 of La Porte Section 00410 <br />Bid Form <br />BID FORM <br />gin f 0.9-1.�1V.-TimmEST PL_�'�#yr'npy #­q -A "M r- -r - _f - r, <br />Bid of Turner Power & Construction, LLC_ an individual proprietorship, a corporation organized and <br />existing under laws of the State of Texas, a partnership consisting of Insurors Indemnity Company for <br />the Northwest Park Soccer Fields Lighting Renovation Rebid for the City of La Porte, Harris County, <br />Texas. <br />-pe undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General <br />Conditions of Agreement, the Technical Specifications and the drawings for the work herein above <br />described and referred to in the Invitation to Bid and has carefully examined the site of the work and will <br />provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other <br />means of construction to complete all the work upon which he bids, as called for in the Contract, the <br />Specifications and shown on the drawings, and in the manner prescribed therein and according to the <br />requirements of the City of La Porte. <br />Total Lump Sum <br />TOTAL BASE BID $ 390,683.00 <br />Written three -hundred nintey thousand six -hundred eighty-three dollars and 00 cents. <br />It is understood and agreed that the work shall be complete in full within 75 calendar days after the date <br />on which work is to be commenced as established by the Contract Documents. <br />The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty <br />(60) days following date of bid opening. <br />WT*6T1111&TArFZ&A=@- a US 4141g.- I IM-4 I po I a <br />TgUM717 acceXiarice •nis proslosai T le Utersignelt S(TU'Ut Tan To enTer into a constructi•n <br />contract and execute bonds as provided in the specifications. In the event the undersigned should fail to <br />enter into a construction contract and execute bonds as required within 14 calendar days after the <br />Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security <br />shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other <br />inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. <br />