My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-12-21 McLarrin sworn
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
04-12-21 McLarrin sworn
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 12:43:13 AM
Creation date
7/25/2025 3:30:34 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
4/12/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
233
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
120c 11 1 <br />NO CONCRETE WORK'"• BASE, HOUSEKEEPINGPAD, GENERATORP <br />2) NO UTILITY COMPANY FEES OR PIPE BOLLARDS AT UTILITY EQUIPMENT. <br />NO ALLOWANCES. <br />4) NO CUTTING AND PATCHING OF ANY CONCRETE OR ASPHALT. <br />NOT PO FOR • OR ABATEMENT OF • r <br />TO HAZARDOUS. <br />, SOUND, DATA, SECURITY, LIGHTNING PROTECTION, PHONEOR <br />BMS WIRING OR EQUIPMENT. <br />7) NO SAW CUT OR BREAK OUT. <br />REMOVALE OF ON-RETE OR ASPHAL <br />NOTES: <br />POWER1 CHANGE ORDERS AND/OR BACK CHARGES WILL REQUIRE 72 HOURS <br />PRIOR NOTICE TO OUR OFFICE. <br />2) TURNER CONSTRUCTION, ONLY AGREE <br />PERCENT RETENTION. <br />3) ALL WORK TO BE PREFORMED DURING NORMAL WORKING HOURS 7:00 A <br />TO M PM.NOTON OVERTIME RATES. <br />
The URL can be used to link to this page
Your browser does not support the video tag.