My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-14-21 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
06-14-21 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 2:47:22 PM
Creation date
7/25/2025 3:31:06 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
6/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DR0007 – Bayside Terrace Drainage Improvement – Designand Construction <br />(HMGP) – City’s Grant Match <br />Account Number: 003/015/019/032/0339881-690Budget <br />Funding:BudgetExpendituresEncumbrancesRemaining <br />Fiscal Year 18-19$ 100,000$ -$ - <br />Fiscal Year 19-202,200,00085,459 <br />Fiscal Year 20-212,000,00043,253 126,629 <br />Total$ 4,300,000$ 128,712 $ 126,629$ 4,044,659 <br />P ROJECT D ESCRIPTION <br />This project will design and construct the needed improvements to redirect, provide adequate <br />capacity and improve drainage in the Bayside Terrace Subdivision. Total cost for this project is <br />estimated at $4,400,000; year one of two year funding. Additional funds to be provided by Fund 003 <br />($400,000) and 033 ($800,000). <br />. <br /> <br />Future Operating Impact: None <br /> <br />F IRST Q UARTER FY 20-21 <br />Preliminary Engineering Report is complete. Design efforts are underway. <br /> <br />S ECOND Q UARTER FY 20-21 <br />Consultant is preparing 60% of the construction plans. <br />18 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.