My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-14-21 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
06-14-21 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/14/2021 2:47:22 PM
Creation date
7/25/2025 3:31:06 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
6/14/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GC0004 – Golf Course Land Improvements <br />Account Number: 0156049-551Budget <br />BudgetExpendituresEncumbrancesRemaining <br />Fiscal Year 19-20$ 169,000$ -$ - <br />Fiscal Year 20-21 - - - <br />Total$ 169,000$ -$ -$ 169,000 <br />P ROJECT D ESCRIPTION <br />This projectwill be used to address necessary infrastructure improvements at the golf course <br />including bridge replacement at Hole #8, cart path repair, culvert repair, bulkhead repair, and <br />an aeration system for the pond at the clubhouse entrance. These funds will be used to repair <br />existing bulkhead on Hole #11 and #15. Also reroute the cart path on Hole #11 so the <br />bulkhead can be tied into the bank for better stability. The culvert on Hole #17/18 will be <br />repaired and aeration system will be added to hole #1 one to circulate the water to help <br />eliminate the algae build up in the pond. <br />F IRST Q UARTER FY20-21 <br />Staff met with two contractors to assess the job needed to be done. Staff will be getting <br />measurements for bulkhead replacement, covert replacement and concrete work for this <br />project. <br /> <br />S ECOND Q UARTER FY 20-21 <br />Measurements for have been taken for new bulkheading to be constructed on holes #1 and <br />#18 along with the measurements to remove the existing bulkheading on hole #11 and #15. <br />Bids will be set up for new construction on hole #1 and #18 and a bid for removing existing <br />bulkhead on hole #11 and #15, taken off property and replaced with new bulkheading. <br />27 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.