My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-28-21 Regular Meeting of the La Porte City Council
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
06-28-21 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2021 9:30:24 AM
Creation date
7/25/2025 3:31:11 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
6/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1.2.3 <br />operation of the transit system as required by a grant to match the federal contribution. These <br />include, but are not limited to: tax levies; general funds; specified contributions, contributions from <br />city, county, or other municipal government towards the Local Share portion of the transit system <br />budget; and other revenues such as advertising. <br /> <br />1.2.4 The Parties agree the County will provide services in accordance with federal requirements. <br />ARTICLE II. <br />2.1 In accordance with the requirements set forth herein, La Porte will provide, maintain, and make available <br />for use with regard to the services hereunder transit stops at all locations chosen by the County. To be <br />using the graphic shown in Exhibit B of this Agreement. As additional FTA capital improvement funds <br />become available, the County may at it sole option, use those funds and Local Matching Funds provided <br />by La Porte to pay for additional transit stop improvements such as connecting sidewalks to stops within <br />¾ miles of a stop or shelter bike paths within three (3) miles that connect to a stop and/or shelter site pads, <br />park benches, and passenger shelters. <br />2.2 All transit stops will have the following minimum standards: <br />(a) A firm stable surface; <br />(b) A minimum clear length of 96 inches measured from the curb or roadway edge and minimum clear <br />width of 60 inches measured parallel to the vehicle roadway; <br />(c) A maximum slope of 1:50 (2%) for water drainage; and <br />(d) An accessible route to the streets, sidewalks or pedestrian paths. <br />2.3 , as well as other media, informing the general <br />public of the availability of transit services in the community. Additionally, La Porte will provide <br />information inserts into its utility bills, but only at such time or intervals as requested by County in writing <br /> The design of the information inserts will be provided by the County. <br />2.4 Within fifteen (15) days of the effective date of this Agreement, La Porte shall send Sixty-Nine Thousand <br />and No/Dollars ($69,000.00) to the County in satisfaction of its obligations to provide Local Matching <br />Funds. Should the County determine that such funds from La Porte are inadequate to pay for the required <br />Local Share portion of the transit system budget during the term of this Agreement, the County shall have <br />no obligation to continue providing the services hereunder unless and until La Porte provides the necessary <br />additional funds to the County for such purpose, subject to the same requirements applicable to use of the <br />original contribution. Additional funds shall be provided by La Porte within forty-five (45) days from La <br /> <br />2.5 La Porte shall comply with the Davis-Bacon and Copeland Anti-Kickback Acts codified at 40 USC § <br />3141, et. seq and 18 USC § 874 to the extent applicable. <br />Page 2 of 10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.