My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21 Regular Meeting
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2021 (2)
>
10-11-21 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 12:52:00 AM
Creation date
7/25/2025 3:31:46 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
10/11/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
number specified in feet on the community's FIRM (at least three feet if no depth <br />number is specified). <br />(2)All new construction and substantial improvements ofnonresidential structures <br />shall have the lowest floor (including basement) elevated at least one foot above the <br />base flood elevation, one foot above the highest adjacent grade at least as high as <br />the depth number specified in feet on the community's FIRM (at least three feet if no <br />depth number is specified), whichever is higher, or <br />b.Together with attendant utility and sanitary facilities be designed so that below <br />one foot above the base specified flood depth in an AO zone, or below one foot <br />above the base flood elevation in an AH zone, the structure is watertight with walls <br />substantially impermeable to the passage of water and with structural components <br />having the capability of resisting hydrostatic and hydrodynamic loads of effects of <br />buoyancy. <br />(3)A registered professional engineer or architect shall submit a certification to the <br />floodplain administrator that the standards of this section, as proposed insection 94- <br />63are satisfied. <br />Sec. 94-90. -Floodways. <br />Located within areas of special flood hazard established in section 94-38 of this chapter are <br />areas designated as floodways. Since the floodway is an extremely hazardous area due to the <br />velocity of flood waters which carry debris, potential projectiles and erosion potential, the following <br />provisions shall apply: <br />(1) Encroachments are prohibited, including fill, new construction, substantial <br />improvements and other development within the adopted regulatory floodway unless <br />it has been demonstrated through hydrologic and hydraulic analyses performed in <br />accordance with standard engineering practice that the proposed encroachment <br />would not result in any increase in flood levels within the community during the <br />occurrence of the base flood discharge. <br />(2) If section 94-90(1) above is satisfied, all new construction and substantial <br />improvements shall comply with all applicable flood hazard reduction provisions of <br />division 3. <br />(3) Under the provisions of 44 CFRChapter 1, Section 65.12, of the National Flood <br />Insurance Program Regulation, a community may permit encroachments within the <br />adopted regulatory floodway that would result in an increase in base flood elevations, <br />provided that the community first completes all of the provisions required by Section <br />65.12. <br />Sec. 94-91. -Coastal high hazard areas. <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.