Laserfiche WebLink
1�1�1�1�1�11 N Mr. Lorenzo Wingate <br />IN INNHALFF City of La Porte <br />,1�1,1�1,1�1 August 4, 2022 <br />Page 8 <br />Services Not Included in this scone of work: <br />• Construction staking <br />• Design of sanitary sewer other than design associated with conflicts to proposed storm sewer and <br />water line <br />• CCTV of existing water, sewer, or storm drain system <br />• Preparing CLOMR or LOMR <br />• Desktop environmental constraints analysis <br />• Environmental permits <br />• Waters of the United States Jurisdictional Assessment <br />• Approved Jurisdictional Determination Assessment <br />• Preliminary Jurisdictional Determination Assessment <br />• Phase I and II Environmental Site Assessment <br />• Cultural Resources Desktop Assessment <br />• Cultural Resources Survey and Reporting <br />• Threatened and Endangered Species Assessment <br />• NEPA Documentation <br />• Traffic studies or signal warrant studies <br />• Traffic Signal design <br />• ROW Acquisition Services <br />• Visual Technology <br />• Construction progress meetings <br />• Construction site visits <br />• Attending the pre -construction and substantial completion inspection meetings <br />List of Assumptions: <br />All consultant fees shown on are lump sum unless otherwise noted. <br />The City of La Porte will provide any procedures, policies, data collection systems, engineering <br />guidelines, standards, and design criteria that will be required for this project. <br />The City of La Porte will retain ownership of any deliverables and electronic files created for this <br />project but will not be supplied with software applications or licenses as part of this project. <br />The proposed conditions analysis is limited to one improvement. Two additional improvement <br />alternatives will be optional services if needed. <br />The preliminary design phase services do not include a 30% submittal. <br />City of La Porte will provide all reports and environmental permitting needed to construct <br />prof ect. <br />7. Geotechnical analysis is scoped under the assumption that the proposed conditions analysis is <br />limited to one improvement to increase the pipe size and no detention facilities. <br />8. Survey will be limited to the highlighted boundary on the Project Area Map. <br />9. The City of La Porte will be responsible for daily construction management of the project and <br />will keep Engineer informed if any deviations to the plans occur. <br />