Laserfiche WebLink
Attachment "B" <br />Brookglen Subdivision Drainage Improvements <br />Date: 5/25/2022 <br />Principal <br />Project <br />seniorcADD <br />Managing <br />Manager <br />Project Engineer <br />ER <br />7echn ician <br />GIS <br />Atlmin <br />Total Hours <br />Total Cost <br />Revision 1: 6/24/2022, Revision 2: 8/4/2022 <br />Director <br />HOURLY RATE <br />$ 259 <br />$ 2, <br />$ 155 <br />$ 131 <br />$ 105 <br />$ 121 <br />$ 60 <br />ITEM 7: GEOTECHNICAL ANALYSIS (If Authorized(: <br />Task 13 — Geotechnical }Analysis (Associated Testing Laboratories, Inc.) <br />13.A Geotechnical Analysis <br />$ 59,794 <br />13.B Coordination and Management of Subconsultant <br />1 <br />8 <br />4 <br />6 <br />19 <br />$ 2,896 <br />Subtotal Hours ..... ..... .. _. ..... ..... .. _. <br />1 <br />..$ 8 <br />4 <br />0 0 <br />.. _. ..... <br />.. _. 0 <br />_. 6 <br />_. .. 19 <br />Subtotal Fee <br />$.... 259 <br />1,656...$ <br />621 <br />$ $ <br />$ <br />$.. <br />360 <br />$.... 62,690 <br />TOTAL FEES: GEOTECHNI CAL ANALYSIS (If Authorized(: <br />I <br />1 <br />1 <br />$ 62,690 <br />ITEM 8: BID PHASE SERVICES (If Authorized(: <br />Bid Phase Services <br />11.A Attend pre -bid meeting & compile notes <br />5 <br />8 <br />13 <br />$ 2,277 <br />11.B Prepare pre -bid responses& respond to questions <br />4 <br />4 <br />8.... <br />16 <br />$ 2,498 <br />11.0 Prepare bid recommendation letter &bid tabulation <br />4 <br />4 <br />8.... <br />16 <br />$ 2,498 <br />Subtotal Hours ..... ..... .. _. ..... ..... .. _. <br />0 <br />..$ 13 .. <br />..$ 16 <br />16 <br />0 <br />..... <br />.. _. 0 <br />_. 0 <br />_. .. 45 <br />Subtotal Fee <br />$.._ <br />2,691 <br />2,484 <br />$ 2,098 <br />$ <br />$ <br />$.. <br />$.... 7,273 <br />TOTAL FEES: BID PHASE SERVICES (If Authorized(: <br />I <br />I <br />$ 7,273 <br />ITEM 9: CONSTRUCTION PHASE SERVICES (If Authorized(: <br />Construction Phase Services <br />12.A Respond to submittals <br />8 <br />40 <br />48 <br />$ 7,866 <br />12.B Respond to RFl_.. <br />8 <br />40 <br />48 <br />$_.. 7,866 <br />12.0 Review change orders and pay estimates <br />8 <br />40 <br />48 <br />$ 7,866 <br />12.D Revisions ..... ..... .. _. ..... ..... .. _. <br />.._ <br />4 <br />16 .. _. <br />.. _. <br />.24 <br />.. _. <br />.. _. <br />.... 44 <br />$.... 5,832 <br />12.E Preparation of Record Drawings, RFI Log, and Submittal Log <br />4 <br />16 <br />24 <br />44 <br />$ 5,832 <br />Subtotal Hours <br />0 <br />32 <br />152 <br />0 <br />48 <br />0 <br />0 <br />232 <br />Subtotal Fee <br />$.... <br />$ 6,624$ <br />23,598 <br />$ <br />$ 5,040 <br />$ <br />$ <br />$ 35,262 <br />TOTAL FEES: CONSTRUCTION PHASE SERVICES (If Authorized(: <br />i <br />I$ <br />35,262 <br />TOTAL FEES: FINAL, BID, AND CONSTRUCTION PHASE (If Authorized(: $ 693,087 <br />TOTAL FEES: PRELIMINARY, FINAL, BID, AND CONSTRUCTION PHASE (If Authorized(: $ 1,128,589 <br />Brookglen <br />I:\45000s\45119\001\Admin\Contracts\Halff-Design Proposal\ <br />8/10/2022 Page 4 of 4 Brookglen Subd'v ision Drainage Improvements LOErev3 <br />