My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-09-22
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2022 (2)
>
09-09-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 1:21:53 AM
Creation date
7/25/2025 3:33:50 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
9/12/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exhibit II <br />City of La Porte <br />Level of Effort for Surveying Services -Brookglen Subdivision -Revision 1 <br />Client: Halff <br />5/23/2022 <br />Task <br />Task Description <br />Project <br />Manager <br />Project RPLS <br />Graduate <br />Engineer . <br />Survey Technican <br />CAD Technician <br />SUE Technician <br />2-Man Survey <br />Clerical Staff <br />Task Hour Totals <br />Cost ($) <br />No. <br />$210.00/Hr <br />$175.00/Hr <br />$120.00/Hr <br />$110. 00/Hr. <br />$95.00/Hr <br />$120. 00/hr <br />Crew $165.00/hr <br />$90/Hr <br />Route Topographic Survey <br />Tie into closest Harris County Flood Control <br />Monument (RM 010270). Set horizontal and vertical <br />1 <br />controls. Horizontal Datum will be NAD 83 (2011 <br />2 <br />4 <br />8 <br />14 <br />$2,110.00 <br />ADJ) Texas South Central Zone (4204).Vertical <br />Datum will be NAVD88 (2001 ADJ). <br />2 <br />Set horizontal and vertical controls <br />2 <br />8 <br />48 <br />58 <br />$9,150.00 <br />Perform Category 6, Condition II topographic survey <br />3 <br />for approximately 18,025 LF to include apparent <br />24 <br />16 <br />400 <br />440 <br />$71,960.00 <br />existing right-of-way only and 100' cross sections <br />Utility Coordination- Survey all markings that indicate <br />4 <br />the presence/approximate location of a subsurface <br />16 <br />24 <br />40 <br />$5,880.00 <br />utility based on 811 one call <br />5 <br />Preform cross sections at 5 locations as shown in <br />8 <br />32 <br />40 <br />$6,160.00 <br />Exhibit I <br />Visit project location with Natural Gas transmission <br />6 <br />line owner to shoot location and elevations (Texas <br />4 <br />8 <br />12 <br />$1,800.00 <br />Eastern Transmission LP) provided by others and to <br />be coordinated by client <br />7 <br />Prepare CAD topographic survey in plan view <br />2 <br />24 <br />120 <br />146 <br />$16,430.00 <br />7 <br />Prepare plan and profiles <br />8 <br />8 <br />60 <br />160 <br />236 <br />$25,480.00 <br />8 <br />Obtain Abstract reports (2 @ $1,000 ea) Lump Sum <br />$2,000.00 <br />9 <br />Review abstract report and record documents <br />4 <br />8 <br />12 <br />$1,580.00 <br />10 <br />Prepare signed and sealed survey control drawings. <br />8 <br />24 <br />32 <br />$4,040.00 <br />ROW based on monumentation found in the field. <br />11 <br />Geotechinical Survey <br />i <br />j 2 <br />j <br />8 <br />8 <br />18 <br />$2,550.00 <br />12 <br />Project Management and QA/QC <br />1 4 <br />1 16 <br />1 16 <br />4 <br />40 <br />$5,920.00 <br />Estimated Hours Sub Totalsl <br />12 <br />1 68 <br />1 100 <br />196 <br />160 <br />20 <br />528 <br />4 <br />1,088 <br />Estimated Fee Sub Totalsl <br />$2,520.00 <br />1 $11,900.00 <br />1 $12,000.00 <br />$21,560.00 <br />$15,200.00 <br />$2,400.00 <br />$87,120.00 <br />$360.00 <br />$155,060.00 <br />\AEE I LS01 Dete\C.dd Amen. Engg\Proposals\Huff Associates\City of L.POffB -Brookglen\Rev 1 \\Level of Effort-Braaku,.-Rev 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.