Laserfiche WebLink
1ASSOCIATED <br />TESTINl <br />lu- J R,1%'11 () is 1 li... S <br />June 15, 2022 <br />Proposal No: GP22-0501-Rev2 <br />Mr. James "Jim" Bielstien, P. E. <br />Public Works Team Leader <br />HALFF Associates, Inc. <br />Houston, Texas <br />Reference: Proposal for Geotechnical Investigation <br />Brookglen Subdivision <br />Drainage, Water Replacement & Pavement Improvements <br />City of LaPorte, Texas <br />Dear Mr. Bielstein, <br />Associated Testing Laboratories, Inc. (ATL) is pleased to submit this proposal to provide <br />geotechnical services for the subject project. This proposal presents a general description of the <br />project, our proposed scope of work to be provided, and the estimated budget for our services. <br />Introduction <br />Based on the information provided by HALFF Associates, Inc., ATL understands that the project <br />consists of drainage improvements, waterline removal & replacement, and pavement by removing <br />existing and replacing it with new concrete pavement within the project alignment inside Brookglen <br />Subdivision along: <br />• The project alignment will run along Brookwood Dr, Brookwood Ln, Venture Ln, Lazy <br />Brook Lane, Somerton Dr, Orchard Ln, Gladwyne, and Huntersfield Ln. <br />• Four (4) outfall structures to be replaced or improved within Brookglen Subdivision. <br />Brookglen Subdivision proposed features that include RCP and RCB improvements and four (4) <br />outfall structures. The project location is presented in Figure 1: Vicinity Map. <br />Scope of Work <br />The scope of the geotechnical investigation is to conduct field investigation, laboratory testing, and <br />geotechnical recommendations for the subject project. Our services include a review of the existing <br />conditions of the drainage system, removal and replacement of water lines, and removal and <br />replacement of existing pavement including the affected driveway along the project alignment within <br />the Brookglen Subdivision, City of La Porte, Texas. It is our understanding that there are four (4) <br />existing drainage outfall structures that require replacement. <br />Field Exploration <br />Prior to the pavement coring and soil investigation, afield reconnaissance study will be conducted <br />by HALFF Associates, Inc. personnel to evaluate the existing site. Upon written request by the <br />County Engineer, a geotechnical study plan will be established. <br />\\Atl-server\geo\Proposal\2022\GP22-0501 - Brookglen Subdivision - La Porte\GP22-0501 - Brookglen Subdivison - Rev2.doc <br />1 <br />