ASSOCIATED <br />TESTING <br />IG, A B 0 f l AVT 0 I[1 II I[ Ali <br />• Subsurface soil and groundwater conditions <br />3143 Yellowstone Blvd, Houston, Texas 77054 <br />Tel: (713) 748-3717 Fax: (713) 748-3748 <br />• Geotechnical design recommendations include site and subgrade preparation after removal of <br />existing pavement, fill and backfill placement, and subgrade and compaction requirements <br />on road pavements and driveways along project alignments if any. <br />• Control of groundwater. <br />• Constructability issues. <br />• Recommendation for outflow structures including RCP & RCB. <br />An electronic copy of the draft report will be initially submitted. Once we have received HALFF <br />Associates, Inc. Consulting Engineers and the Harris County Engineer's review comments, an <br />electronic copy of the final report will be issued incorporating the comments. <br />Cost Estimate <br />Based on the scope of work outlined above, we estimate the cost for the field, laboratory, and <br />engineering services for the geotechnical services presented in this proposal to be $59,794.00 <br />(including pavement coring and patching) <br />The cost estimates using the estimated project quantities and requirements are presented in the <br />enclosed Itemized Geotechnical Fee Estimate spreadsheet. This estimate assumes: that <br />underground utilities at proposed boring locations will be cleared by Texas 811 Call Service and/or <br />private property maintenance personnel; boring locations and elevations will be surveyed by others; <br />that the sites will be accessible to our truck -mounted equipment; and environmental sampling/ <br />handling/ transportation/ disposal are not in the scope of this project. Permission/permit to access <br />the site, if needed, will be arranged by others at no cost to ATL. <br />Proiect Schedule <br />Upon written notice, from the County Engineer, to proceed with the geotechnical study plan, the <br />geotechnical consultant will begin the geotechnical study. Once this project is authorized and Notice <br />to Proceed is received, and after HALFF Associates, Inc. conducted the initial site conditions <br />survey and layout of the preliminary locations for soil borings, ATL personnel will conduct a site <br />visit within 3 days to visit the proposed boring locations and assess the site logistics. The <br />coring/boring locations will be field adjusted according to the site conditions (including traffic <br />conditions, existing utilities, etc.). <br />ATL will call Texas 811 Call Services to request utility clearance for the coring/boring locations <br />(which requires at least 3 days for clearance). ATL plans to conduct the soil borings in about 2 days <br />after HALFF Associates, Inc. has completed the existing conditions survey. The laboratory soil <br />testing will take about one week to complete. ATL will submit a draft report in about 3 to 4 weeks. <br />\\Atl-server\geo\Proposal\2022\GP22-0501 - Brookglen Subdivision - La Porte\GP22-0501 - Brookglen Subdivison - Rev2.doc <br />11 <br />