My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-23-23
LaPorte
>
.Agendas
>
City Council
>
2020's
>
2023 (2)
>
10-23-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2024 2:57:10 PM
Creation date
7/25/2025 3:33:58 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:10-23-2023 <br />CIP Budget <br />Requested By:Doug Ditrich, Chief of Police Source of Funds: <br />Department:Police <br />015-5253-521-1100 <br />Account Number: <br />$225,658 <br />Amount Budgeted: <br />ReportResolutionOrdinance <br />$13,990 <br />Amount Requested: <br />Exhibits: Haz Mat Special Services Quote <br />Budgeted Item:YesNo <br /> <br />SUMMARY& RECOMMENDATION <br />During the April 2023 Council Retreat, the City Council received a report on the collapsed block <br />wall at the La Porte Police Department gun range and a proposed rebuilding project. Council <br />directed staff to proceed with the proposed project and included $225,658 in the FY 2024 budget <br />for the implementation of the project. <br />The project consists of two phases. Phase 1 of the project includes removal and proper disposal <br />ofthe existing lead-filled rubber blocks and miscellaneous materials from the site. This phase was <br />tabled from any action during the October 9, 2023 council meeting. Phase 2 covers the installation <br />of a new range system.City Council approvedthis phase which includes the installation ofa <br />rubber berm system,miscellaneous construction material costs and contingency for a total <br />expenditure of $160,299.50 during the October 9, 2023. <br />Staff requested quotes from three different vendors for Phase 1 and after receiving the quotes, <br />the low bid was from Haz Mat Special Services, LLC, for$13,990.This quote was substantially <br />less than initially projected by staff; therefore, staff conducted follow up with the vendor who <br />assured them the demolition could be completed within the requested scope of work, including all <br />legal requirements for disposal of the debris. Staff also performed reference checks on Haz Mat <br />Special Services and did not find any negative information that would exclude the vendor. <br />Haz Mat Special Services, LLC,obtainedleadsamples fromexistingrubber blocks and according <br />to the vendor the results indicated the materials can be deposited at a Category 1, non-hazardous <br />landfill.The vendor has identified a landfill to accept the debris if awarded the bid. <br />The Police Department recommends Council approve the Police Department to proceed with the <br />range rebuild project utilizing Haz Mat Special Services, LLC, to remove the existing blocks and <br />materials. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.