97
<br />Remove and replace 6-inch concrete curb, complete in place
<br />L F.
<br />3,100
<br />$7.00
<br />$21,700
<br />the sum of:
<br />98
<br />7.5" reinforced concrete pavement, complete in place the sum
<br />S.Y.
<br />5,000
<br />$70.00
<br />$350,000
<br />of:
<br />99
<br />6" lime stabilized sub rade, complete in place the sum of:
<br />S.Y.
<br />5,760
<br />$7.00
<br />$40,320
<br />100
<br />Lime for stabilized subgrade (8% by dry unit weight), complete
<br />TON
<br />105
<br />$200.00
<br />$21,000
<br />in place the sum of:
<br />101
<br />Remove, store, and reset existing traffic sign, complete in
<br />EA
<br />2
<br />$400.00
<br />$600
<br />lace the sum of:
<br />102
<br />Traffic Control, complete in place the sum of:
<br />LS
<br />1
<br />$15,000.00
<br />$15,000
<br />103
<br />SWPPP, complete in lace the sum of:
<br />LS
<br />1
<br />$7,500.00
<br />$7,500
<br />Cou land Paving Items Total: $646 200
<br />SUPPLEMENTAL BID ITEMS:
<br />104
<br />Remove and reset existing mailboxes, complete in place the
<br />EA
<br />30
<br />$600.00
<br />$18,000
<br />SUM of:
<br />105
<br />Extra cement stabilized sand, complete in place, the sum of:
<br />C.Y.
<br />30
<br />$35.00
<br />$1,050
<br />Adjust existing valve box, meter box, or cleanout to be flush
<br />106
<br />with top of proposed pavement or finished grade, complete in
<br />EA.
<br />4
<br />$500.00
<br />$2,000
<br />lace the sum of:
<br />107
<br />Long side water line service reconnection, complete in place
<br />the sum of:
<br />EA.
<br />19
<br />$1,500.00
<br />$28,500
<br />108
<br />Long side sewer line service reconnection, complete in place
<br />EA
<br />12
<br />$1,500.00
<br />$18,000
<br />the sum of:
<br />109
<br />Additional footage for water service, complete in place the
<br />L,F.
<br />50
<br />$15.00
<br />$750
<br />sum of:
<br />110
<br />Additional footage for sewer service, complete in place the
<br />L.F.
<br />sum of:
<br />50
<br />$25.00
<br />$1,250
<br />111
<br />Installation and removal of piezometers, complete in place, the
<br />EA,
<br />3
<br />$400.00
<br />$1,200
<br />sum of;
<br />112
<br />Bank Sand, complete in place, the sum of:
<br />C.Y.
<br />30
<br />$15.00
<br />$450
<br />113
<br />Well pointing for proposed storm sewer, all depths, including
<br />L. F.
<br />150
<br />$20.00
<br />$3,000
<br />all appurtenances, complete in place, the sum of:
<br />Wet Condition Bedding for storm sewer installation, all Sizes,
<br />114
<br />all Depths, consisting of Limestone or recycled concrete
<br />L.F.
<br />150
<br />$10,00
<br />$1,500
<br />foundation, filter fabrics and all appurtenances, complete in
<br />lace, the sum of:
<br />115
<br />Relocate street light pole as per utility company's
<br />EA.
<br />12
<br />$2,000.00
<br />$24,000
<br />requirements, complete in lace the sum of:
<br />Cou land Su lemental Items Total: $99 700
<br />LOMAX LIFT STATION AND SANITARY SEWER
<br />Lift Station and Force Main Items Total: $3481 150
<br />w. _.w .w �. y._..
<br />_ .. _..
<br />Sanitary Sewer Items Total $5,935,425
<br />Tree Protection Items Total: $168 600
<br />SuEplemental Items Total: $903 750
<br />Total Construction Cost - Lomax Lift Station and Sanitary Sewer: $10,488,925
<br />Contingency (5%)_ $524,450
<br />O lnion of Probable Construction Costs - Lomax Lift Station and Sanita Sewer: $11 013 375
<br />COUPLAND DRIVE DRAINAGE AND PAVING
<br />Coupland Storm Sewer Items Total: $715 900
<br />Coupland Paving Items Total $646,200
<br />Cou land Supplemental Items Total: $99 700
<br />Total Construction Cost-yCoupland Drive: $1,461,800
<br />_ Contingency 5°) $73 090
<br />O inion of Probable Construction Costs - Cou land Drive: $1 534 890
<br />Total O inion of Probable Construction Costs: $12,548 265
<br />nese esumutes ure presenrea�or ptatintng purposes only ana are strbject to ciaange as lfte project p•ogresses