97 <br />Remove and replace 6-inch concrete curb, complete in place <br />L F. <br />3,100 <br />$7.00 <br />$21,700 <br />the sum of: <br />98 <br />7.5" reinforced concrete pavement, complete in place the sum <br />S.Y. <br />5,000 <br />$70.00 <br />$350,000 <br />of: <br />99 <br />6" lime stabilized sub rade, complete in place the sum of: <br />S.Y. <br />5,760 <br />$7.00 <br />$40,320 <br />100 <br />Lime for stabilized subgrade (8% by dry unit weight), complete <br />TON <br />105 <br />$200.00 <br />$21,000 <br />in place the sum of: <br />101 <br />Remove, store, and reset existing traffic sign, complete in <br />EA <br />2 <br />$400.00 <br />$600 <br />lace the sum of: <br />102 <br />Traffic Control, complete in place the sum of: <br />LS <br />1 <br />$15,000.00 <br />$15,000 <br />103 <br />SWPPP, complete in lace the sum of: <br />LS <br />1 <br />$7,500.00 <br />$7,500 <br />Cou land Paving Items Total: $646 200 <br />SUPPLEMENTAL BID ITEMS: <br />104 <br />Remove and reset existing mailboxes, complete in place the <br />EA <br />30 <br />$600.00 <br />$18,000 <br />SUM of: <br />105 <br />Extra cement stabilized sand, complete in place, the sum of: <br />C.Y. <br />30 <br />$35.00 <br />$1,050 <br />Adjust existing valve box, meter box, or cleanout to be flush <br />106 <br />with top of proposed pavement or finished grade, complete in <br />EA. <br />4 <br />$500.00 <br />$2,000 <br />lace the sum of: <br />107 <br />Long side water line service reconnection, complete in place <br />the sum of: <br />EA. <br />19 <br />$1,500.00 <br />$28,500 <br />108 <br />Long side sewer line service reconnection, complete in place <br />EA <br />12 <br />$1,500.00 <br />$18,000 <br />the sum of: <br />109 <br />Additional footage for water service, complete in place the <br />L,F. <br />50 <br />$15.00 <br />$750 <br />sum of: <br />110 <br />Additional footage for sewer service, complete in place the <br />L.F. <br />sum of: <br />50 <br />$25.00 <br />$1,250 <br />111 <br />Installation and removal of piezometers, complete in place, the <br />EA, <br />3 <br />$400.00 <br />$1,200 <br />sum of; <br />112 <br />Bank Sand, complete in place, the sum of: <br />C.Y. <br />30 <br />$15.00 <br />$450 <br />113 <br />Well pointing for proposed storm sewer, all depths, including <br />L. F. <br />150 <br />$20.00 <br />$3,000 <br />all appurtenances, complete in place, the sum of: <br />Wet Condition Bedding for storm sewer installation, all Sizes, <br />114 <br />all Depths, consisting of Limestone or recycled concrete <br />L.F. <br />150 <br />$10,00 <br />$1,500 <br />foundation, filter fabrics and all appurtenances, complete in <br />lace, the sum of: <br />115 <br />Relocate street light pole as per utility company's <br />EA. <br />12 <br />$2,000.00 <br />$24,000 <br />requirements, complete in lace the sum of: <br />Cou land Su lemental Items Total: $99 700 <br />LOMAX LIFT STATION AND SANITARY SEWER <br />Lift Station and Force Main Items Total: $3481 150 <br />w. _.w .w �. y._.. <br />_ .. _.. <br />Sanitary Sewer Items Total $5,935,425 <br />Tree Protection Items Total: $168 600 <br />SuEplemental Items Total: $903 750 <br />Total Construction Cost - Lomax Lift Station and Sanitary Sewer: $10,488,925 <br />Contingency (5%)_ $524,450 <br />O lnion of Probable Construction Costs - Lomax Lift Station and Sanita Sewer: $11 013 375 <br />COUPLAND DRIVE DRAINAGE AND PAVING <br />Coupland Storm Sewer Items Total: $715 900 <br />Coupland Paving Items Total $646,200 <br />Cou land Supplemental Items Total: $99 700 <br />Total Construction Cost-yCoupland Drive: $1,461,800 <br />_ Contingency 5°) $73 090 <br />O inion of Probable Construction Costs - Cou land Drive: $1 534 890 <br />Total O inion of Probable Construction Costs: $12,548 265 <br />nese esumutes ure presenrea�or ptatintng purposes only ana are strbject to ciaange as lfte project p•ogresses <br />