My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-02-11 Planning and Zoning
LaPorte
>
.Agendas
>
Planning and Zoning Commission
>
2010's
>
2011
>
08-02-11 Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:09:09 AM
Creation date
7/25/2025 3:43:51 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
8/2/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
been maintained and well -planned mthat we continue to have adequate <br />facilities and services. The transportation system has improved local and <br />regional mobility, not only on our roadways, but on our rail network, trail <br />system, bus routes, and airport. We have continuously improved the water, <br />wastewater, and drainage systems to meet guidelines and to provide the <br />necessary operating capacities to serve expanded and new industries; which <br />has continued to give us a competitive advantage over less prepared <br />communities. Our excellent public safety services have continued to make us <br />feel safe. Finally, an overall, unyielding commitment to excellence has <br />permeated through all levels of staff, which has resulted in greater <br />responsiveness to our needs and for those who visit or do business within <br />City limits. <br />Our character and appearance has continued to improve over the <br />past 10yearu through aggressive implementation ufour vision. First and <br />foremost, m continued emphasis on the appearance of our gateways and <br />corridors has had a dramatic effect on the image of the community. Our <br />recent gateway improvements, denoted by significant entry features, have <br />been expanded outward through enhanced roadway beautification efforts, <br />better litter control, and improved buffering and design controls of the <br />abutting land uses. We have successfully coordinated the efforts of the <br />public and private sectors to finish the infrastructure improvements to Main <br />Street, finished development of the Town Plaza at Five Points, and fully <br />implemented the improvements to S. Broadway Avenue and Texas Avenue, <br />as planned for in the La Porte Beautification Master Plan, The resulting <br />reinvestment demonstrated to the private sector the community's resolve to <br />achieve a highly livable, quality, and sustainable community, and resulted in <br />increased private sector investment through such projects axthe Gateway <br />Project to La Porte (Fairmont Parkway and Canada Road), and throughout <br />the entire City. Consequently, our overall community now exhibits a <br />character that better reflects our expectations, improved our collective self- <br />esteem, and enhanced our external image. <br />1.4 Contextual Framework <br />What is the Purpose of this Comprehensive Plan <br />This master plan baoimportant policy document because itis: <br />= Visionary. |tlays out abroad, long-term vision with associated goals and <br />recommendations regarding future investment, resiliency, and <br />enhancement ofthe community; <br />
The URL can be used to link to this page
Your browser does not support the video tag.