My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
11-17-11 Planning and Zoning
LaPorte
>
.Agendas
>
Planning and Zoning Commission
>
2010's
>
2011
>
11-17-11 Planning and Zoning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:12:20 AM
Creation date
7/25/2025 3:43:56 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
11/17/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DRAFT OCTOBER 17, 2011 <br />18,500 water service connections that are estimated to occur by the Year <br />2041. <br />6) Identify and eliminate any remaining dead-end water mains. <br />7) Periodically review the existing Surface Water Supply Contract to ensure <br />that it will provide the necessary amount of water to supply the City's <br />build -out development. At minimum, a review should be conducted if <br />water use per capita increases to 400 gallons per day. <br />8) Continue to fund and implement an aggressive maintenance program <br />and annual water line replacement program. This has become <br />particularly important due to deficiencies identified during the recent <br />drought, e.g., some of the existing concrete asbestos piping in the City <br />has shown not to be as durable as other types of piping, and thus should <br />be prioritized for replacement. <br />9) Periodically update the Water Master Plan, Water Conservation Plan, <br />and Drought Contingency Plan to reflect changing conditions. <br />capacityGOAL 4: Sufficient and efficient wastewater systems and <br />accommodate the build -out population and compliance with state/fecle rl <br />Actions and Initiatives <br />1) Conduct a feasibility study to determine if the wastewater treatment <br />plant (WWTP) can be improved to increase the total available quantity of <br />reuse water and to determine where additional public or private reuse <br />opportunities in the City might be located. <br />2) Continue to allocate approximately $350,000 annually to combat <br />infiltration and inflow (1/1) problems and thus, minimize the amount of <br />water reaching the WWTP that does not need to be treated. <br />3) Continue to allocate funding, as needed, to conduct lift station <br />evaluation studies as means for identifying the highest priority lift <br />stations to be replaced, consolidated, or eliminated. Currently, funding <br />should be allocated to upgrade the following projects as identified in the <br />most recent Lift Station Evaluation Study: <br />a. Lift Station 10_jcompleted as of 2011 , <br />b. Lift Station 19; <br />c. Lift Station 37_Jscheduled for completion Jan. 2012 ,- <br />d. Lift Station 14; and <br />e. Lift Station 13. <br />4) Continue to allocate funding to replace, consolidate, or eliminate at least <br />one lift annually per the recommendations identified in the lift station <br />evaluation studies. <br />5) Continue to apply for Community Development Block Grant (CBDG) <br />funds to increase the resiliency of infrastructure systems. This should <br />include, among other things, purchasing additional backup generators at <br />the WWTP to ensure sufficient operational capacity during power <br />outages. <br />A COMMUNITY VISI N FOR LAPORTE, TEXAS -2 10 L.PDATL <br />
The URL can be used to link to this page
Your browser does not support the video tag.