Laserfiche WebLink
• <br />• <br />� Harris County has retained Wayne Smith and <br />Associates to prepare a preliminary engineering <br />report. <br />� The report estimates the roadway improvements to <br />cost between $5.3 million & $7.8 million (excluding <br />right-of-way) depending on the amount of drainage <br />improvements programmed into the project. <br />:z La Porte needs to secure additional right-of-way <br />from landowners (PPG, Bryan and David Moore, <br />and DuPont La Porte Employees Federal Credit <br />Union). <br />:: Commissioner's Court will consider authorizing the <br />consultant to proceed with the final design at their <br />.- March meeting. <br />• <br />• <br />