Laserfiche WebLink
• <br />Active Projects <br />Preliminary <br />Summary <br />nvestigation/Engineering <br />Est. Cost (millions) <br />:) SH 146 south of <br />Fmt. Pkwy. (MIS) <br />:) Fmt. Pkwy. <br />(SH146 to 16t" St.) <br />Fmt. Pkwy. grade <br />separation @ UPRR <br />Bay Area Blvd. <br />::� Fmt. Pkwy. <br />turning lanes <br />Total <br />Future Projects <br />No Definitive Activity/Schedule <br />11 <br />$201 million Sens Road from W. Main to SH225 <br />� Powell Road from Fairmont <br />Parkway south, then east to <br />$3.23 million Weems Boulevard and SH146 <br />:z So. Broadway from Fairmont <br />$5-11 million Parkway to Weems Boulevard � <br />� Canada Road from West Main to <br />$5.3- 7.8 million Fairmont Parkway <br />$.8 million � No. 16'h from Barbour's Cut to <br />SH146 <br />$220+ million <br />