Laserfiche WebLink
• <br />u <br />EXHIBIT A <br />• CAPITAL E%IPROVEMENT PROJECT COST ESTIMATE FORM <br />Project Number: PM2005 3 Departmental Ranking: 2 <br />Project Name: Meadowcrest Subdivision Sidewalk <br />Responsible Department: Planning <br />TYPE OF COST: <br />PROJECT SCHEDULE: <br />Land: <br />Planning: <br />yrs. <br />mos. <br />Design & Consulting: $ 2,750.00 <br />Design: <br />yrs. <br />3 mos. <br />Construction: $16gsn nn <br />Engineering: <br />yrs. <br />2 mos. <br />Furnishings or Equip: <br />Land/ROW Acq.: <br />yrs. <br />mos. <br />Other <br />Construction Letting: <br />yrs. <br />2 mos. <br />Contingency: $ 2,700.00 <br />Construction: <br />yrs. <br />4 mos. <br />Total project estimate: $32,400.00 <br />Total time to complete: <br />yrs. <br />_I I mos. <br />• DOES THIS COST ESTIMATE OR SCHEDULE ANTICIPATE USE OF CITY FORCES TO <br />COMPLETE THE PROJECT? (DESCRIBE): <br />In-house Survey, Drafting, Design -Planning, <br />ANNUAL IMPACT ON CITY OPERATIONAL COSTS (DESCRIBE): <br />None <br />Total estimated Annual Impact on City Operating Cost None <br />• Attach additional sheets if needed. <br />