Laserfiche WebLink
• .0 <br />0 Fire Department Future Bond Projects <br />Fire Training Facility Upgrade <br />This project would extend the use of the FTF into the future. With <br />the expected development in the immediate area smoke will become an <br />issue with our present training facility. Already we have certain wind <br />conditions that affect our neighbors with the smoke from the burning <br />hay we use for fuel, which will impact our ability to utilize the field for <br />our training, and for rentals. We expect that the air quality monitoring <br />agencies will ban fuels that produce allot of smoke at these type <br />facilities. Propane properly burned produces no smoke. <br />• Install three propane fueled, computer controlled burners inside <br />the existing two burn structures to simulate interior firefighting. <br />• Install three propane fueled fire props on existing paving, ie: <br />flange fire, pump seal fire, and tank fire. <br />• Install propane fuel tank and associated piping to support props <br />• and simulators, which will include boring or saw cutting existing <br />concrete paving for fuel lines and control circuits. <br />Estimated cost: 2 M <br />VHF Radio Trunking Project <br />This project will allow the Fire Department and EMS to trunk the <br />existing radio frequencies to expand our communication capabilities by <br />opening up more channels. <br />• Purchase equipment needed for the conversion <br />• Installation of the equipment <br />Estimated cost: 250 K <br />• Fire Station One/Fire Administration Replacement Project <br />