My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
08-21-2002 Committee Meeting
LaPorte
>
.Minutes
>
Bayport/Port of Houston Expansion Review Committee
>
2002
>
08-21-2002 Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2022 7:05:56 AM
Creation date
7/31/2025 10:27:05 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Bayport/Port of Houston Expansion Review Committee
Meeting Doc Type
Minutes
Date
8/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B" —7 <br />A PRECAST CONCRETE OR GALVANIZED STEEL, WIDE <br />FLANGE SUPPORT. SUPPORTS TYICALLY SPACED 20 <br />PRE -CAST FEET APART. SUPPORTS WILL BE PLACED TO AVOID <br />PANEL WETLANDS BUT ALLOW PANEL TO SPAN WETLAND AREAS. <br />PRE -CAST <br />PANEL <br />20' <br />TOP OF DRILLED CONCRETE PIER <br />ANTICIPATE GAP BETWEEN GROUND AND BOTTOM <br />OF PANEL TO PROVIDE DRAINAGE TO VARY <br />BETWEEN 6' AND 12' <br />SOUTHERN LIMIT OF PIPELINE EASEMENT <br />IY <br />TREE GUARANTEE OF 3 TREES EVERY <br />20 LINEAR FEET BETWEEN WALL AND <br />SOUTHERN LIMIT OF PIPELINE EASEMENT <br />�WALLEL 5UPPORT <br />20' PR�AST WALL <br />20' PRE -CAST WALL <br />BAYPORT SHIP CHANNEL <br />20' -- <br />0' v <br />3 0 <br />SOUTHERN LIMIT OF ° <br />PIPELINE EASEMENT a <br />I <br />EXISTING GROUND - <br />DRILLED PIER _ <br />L 0 to 40' <br />a` <br />NOT FOR CONSTRUCTION <br />CRDSS SLCTION z <br />]iumerCoMeOBradenInc. o <br />STOH � <br />�� ry Bayport North Shore ry <br />�o <br />Typical Details <br />
The URL can be used to link to this page
Your browser does not support the video tag.