Laserfiche WebLink
<br />. <br /> <br />Port of Houston Authority <br />Wetland Mitigation Plan <br /> <br />MAY <br />~ of Houston Authority NO.120(ReViSed) <br />.veston Bay, along the Bayport S Channel, <br />City of Pasadena, Harris County, Texas. <br />Attachment 1, Sheet /7 of -M-.(Revised May 2003) <br /> <br />7 2003 <br /> <br />Other than necessary brush control and other preparatory measures, areas not selected for <br />excavation or levee placement will not be disturbed. Water will overflow from the systems <br />through a spillway structure in the north marsh and discharge to the Harris County drainage <br />canal through an existing drainage point. The spillways will be designed to handle the <br />maximum discharge that would be expected from a 1 DO-year precipitation event. Appropriate <br />erosion control measures (e.g., contouring, vegetation planting, and riprap) will be implemented <br />downstream of the spillways. <br /> <br />After earthwork is complete, but before planting is initiated, a topographic "as-built" survey will <br />be conducted by a licensed surveyor, The survey will be conducted to determine if, planting <br />surface elevations, levee elevations, and spillway elevations are within the thresholds set forth <br />in this document. If the results of the survey show that the structures are at appropriate <br />elevations, PHA will initiate planting. <br /> <br />. <br /> <br />If the survey indicates that expected elevations have not been achieved, corrective actions will <br />be taken to bring the Site to required elevations. A second survey will be conducted in areas <br />affected by the corrective actions to ensure that the Site meets required elevations. If required <br />elevations are not achieved, additional corrective actions and surveys will be required. The "as- <br />built" survey drawing(s) will be submitted to the USACE along with the Post-Construction Report <br />following completion of planting. <br /> <br />Prior to planting, all planting surfaces will be fertilized based on soils analysis results. and <br />formulated for root and rhizome production (high phosphorus). The area will be flooded to the <br />point where the soil is saturated prior to planting. <br /> <br />The constructed wetland area will be planted with a variety of emergent wetland species to <br />augment the existing site diversity. A reference wetland near the mitigation site was identified <br />on the Armand Bayou Nature Center property across Red Bluff Road from the mitigation site. <br />The reference wetland has been recently restored by the Nature Center. The site had been <br />cleared of trees, sprigged with native grasses, and allowed to re-vegetate to its current state. <br />Species composition includes a good representation of native wet prairie and prairie wetland <br />plants that may be expected to do well in the mitigation wetland. <br /> <br />. <br /> <br />Benchmark Ecological Services, Inc. <br /> <br />May 2003 <br />